You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

This page contains draft contributions for writing the proceedings of the BT reports to the GLAST Symposium.
We will have one single paper combining the four contributions. All the people in the BT team will sign the paper.

Proposed Table of Contents pdf , tex

Proposed distribution of parts to write:

Introduction - beam test goals and preparation, sections 1,2 (Luca/Philippe)
Beam test setups, DAQ, online, CU integration and operation (Nicola)
CU calibration with CR and beam (Sasha for CAL, Leon for TKR, Alex for ACD)
Simulation, Francesco, section 6
TKR and PSF, sections 7.1 8.1 (Leon, Nicola)
Energy resolution, sections 7.2, 8.2 (Philippe)
ACD results, sec 8.3 (Luis) pdf tex fig 1 (eps|gif) fig2 (eps|gif)
Background sources, scetion 9 (Johan, Carmelo)
GSI stuff, scetion 10 (Luca)
Conclusions ...

Deadlines

march 12 - internal BT deadline to circulate different contributions for merging
march 19 - internal LAT deadline to circulate draft for review

  • No labels