  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minStatusAll
  • JF4M initial shipment received. Power supply talks, cable tests next(?)
  • Deep clean completed.
  • Hansson: Hiring complete, DAPC approved. Expect arrival Dec/Jan. Need tasking plan.
  • Trying to create compelling case for Tixel for September PEC...taking a long time, ongoing.
  • ePix100s forwarded to TID for refurb?
  • Need firmware on 10k small to test....status?
  • SLAC-level Detector Strategy Task Force: Three meetings, presenting to SAC, SPC, and LDAC.
  • Got no detector feedback from user's meeting...?
  • DAQ rack plinth set received, fit questionable.
  • Seismic table mount components received..to be installed.
  • LDAC set for Dec. 3-4.
    • Status of 2018 recommendations: 18 closed/complete, 13 in work/on track, 3 deferred/rejected (Doc available).
    • NEED:
      • RIXS-CCD need analysis of flux limitations (status?)
      • 'White paper' on zero-suppression tradeoffs (in work).
      • Data analysis on ePix prototypes tested in Run 17.
      • Presentation on Jungfau 4M??
  • Development Program: Managed to spend all development funding in FY19.
    • Development options green-lighted:
      • Purchased new Cd rad source for testing ePix platform done
      • OK'd outside testing of ePix to ~10krad done, at Sandia
      • ePix dummy bond to Ge to test method and thermal ($70k)
      • ePixHi-Z cold testing ($70k)
      • Purchase of CZT material from Redlen ($15k)
      • Tixel: Design sparse readout architecture ($100k).
      • ePix: Design shingled high-rate camera ($100k)
      • SXR microwave annealing machine ($60k) done, received

 

 

 

Status:

  • RA: E-gun brackets in.
  • CXI stage can't handle CSPAD weight, crane overloaded, no obvious plan.

    JF is focus for foreseeable.
    Wavefront sensor work with Matt Seaburg.

    JF interface document development....where do we want to draw the line? MEC EMP testing CSPAD/ePix Date TBD


  • PH: Wiring diagram for Jungfrau (Sameen)
  • Need automated check on pedestal levels...Jason left and no one has picked up.....PH to follow up with Silke.
    • Silke to establish a couple of data streams to examine performance on dropped shots etc.
  • UXI options? Nothing until next year....Liam here this week.
  • EMP testing confusing, un-grounded CSPAD testing this week...
  • Mike Brown has set up ePix10k and ePix100 on XCS for software development...not done?
  • DAQ can run ePix100, ePix10k, Jungfrau....can't yet save data.
  • Need to check with Chris about data reduction from Run 17.
  • KN:
  • PDU by the end of September?? For ePixBig
  • Matt Church helping with Wave8 ?? Need to mount close as possible to flange.
  • All JF Cables are in workm
  • KZ: Draft RIXS CCD procedure completed.
  • ePix10k requires new MPODS, working issue
  • Status documentation/procedures effort

  • KZ:
  • RIXS-CCD Procedure draft complete. Review at next detector meeting??
  • RIXS-CCD setup work
  • Toolbox organization/reorder scheme.
5 minBudget Updatemmck
  • M&S Status (per peoplesoft this morning)
  • Labor snapshot (July actuals):
15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business  

Action items