You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Date

Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minStatusAll
  • Lab cleanup prep for depp clean Friday.
  • Hansson: Negotiations with ISO ongoing....visa situation is complicated..
  • Trying to create compelling case for Tixel for September PEC...taking a long time, ongoing.
  • Need 'triage' list for epIx detectors...prioritize which need repair (complete? forwarded to TID?)
  • New detector strategy task force, at lab level, First meeting Monday 9/30.
  • Data gathering at User's Meeting this week....questionnaire circulated. Who's attending the sessions?
  • ePixBig/Quads status review completed...on track.
  • DAQ rack plinth set received
  • Seismic table mount components received.
  • LDAC set for Dec. 3-4.
    • Status of 2018 recommendations: 18 closed/complete, 13 in work/on track, 3 defered/rejected (Doc available).
    • NEED:
      • RIXS-CCD need analysis of flux limitations (status?)
      • 'White paper' on zero-suppression tradeoffs (in work).
      • Data analysis on ePix prototypes tested in Run 17.
      • Presentation on Jungfau 4M??
  • Development Program: had been looking at an overrun, now looking at an underrun of few hundred $k.
    • Development options green-lighted:
      • Purchased new Cd rad source for testing ePix platform done
      • OK'd outside testing of ePix to ~10krad done, at Sandia
      • ePix dummy bond to Ge to test method and thermal ($70k)
      • ePixHi-Z cold testing ($70k)
      • Purchase of CZT material from Redlen ($15k)
      • Tixel: Design sparse readout architecture ($100k).
      • ePix: Design shingled high-rate camera ($100k)
      • SXR microwave annealing machine ($60k) done, received

    • Ops spending to consider:
      • ePixS: Build small camera for use in Run 18 ($75k)
      • ePix10k 2MV (vacuum) parts: $100k)
      • Interlocks for GSFC x-ray source ($15k)
      • ePix100 additional spare modules ($24k)
      • $3k for metrology of existing ePixBig (FY19)
      • $25k to formally release ePixBig drawings/models in TeamCenter (FY20).

 

 

 

 

Status:

  • RA: E-gun brackets in.
  • CXI stage can't handle CSPAD weight, crane overloaded, no obvious plan.

    JF is focus for foreseeable.
    Wavefront sensor work with Matt Seaburg.

    JF interface document development....where do we want to draw the line? MEC EMP testing CSPAD/ePix Date TBD


  • PH: Wiring diagram for Jungfrau (Sameen)
  • Need automated check on pedestal levels...Jason left and no one has picked up.....PH to follow up with Silke.
  • UXI options? Nothing until next year....
  • EMP testing confusing, CSPAD is shorted to ground....need to break that connection to do a fair comparison to ePix10k for troubleshooting purpose.
  • CSPAD Quad given to TID for isolation/testing as next stage.
  • Mike Brown has set up ePix10k and ePix100 on XCS for software development...not done?
  • DAQ can run ePix100, nothing else so far.....


  • KN:
  • Need to buy stock items....
  • Source 'male' half of ribbon connector
  • Wave8 for FIM ?? Review complete, now in fab.
  • JF interlock meeting on Wednesday

  • KZ: Draft RIXS CCD procedure completed.
  • ePix10k requires new MPODS, working issue
  • Status documentation/procedures effort

  • KZ:
  • RIXS-CCD Procedure draft complete. Review at next detector meeting??
  • RIXS-CCD setup work
  • Toolbox organization/reorder scheme.
5 minBudget Updatemmck
  • M&S Status (per peoplesoft this morning)
  • Labor snapshot (July actuals):
15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business  

Action items

  • No labels