Set and status planning activities for detector development and deployment.
Discussion items
Time
Item
Who
Notes
30 min
Status
All
Single 90 min meeting going forward, rather than two 60min meetings?
ePix Update:
Met with Chris Kenney last week regarding sparing strategy for ePix support. TID-AIR has proposed some funding options to consider:
$60k for parallel ePix10k flipchip bonding run (FY19)
$3k for metrology of existing ePixBig (FY19)
$75k for two new ready-spare ePix100 cameras and additional modules for repairs, depending on yield. (FY19)
$5k to build a case for the existing ePixBig with the changes requested by HXR for the new ePixBig (FY19)
$25k to formally release ePixBig drawings/models in TeamCenter (FY20)
$1k for a pair of pelican cases for the ePixBigs (FY19)
Total for FY19 $145k. I'm inclined to fund all o this spending out of a combination of OIP and Infrastructure....thoughts?
Testing has begun on ePixHR: Chip is alive and registers can be programmed...more results soon. Rebaseline after we know whether it works.
SXR requirements doc singed off.
TES re-baseline document not yet forwarded to LCLS mgmt. I'm late on this.
Project document for MCP/TImepix is now in review with Anton. Need to get funding rolling, and to set up a visit to kick this off.
Traveled to BES and APS last week. There are several collaboration opportunities that we need to look into:
Hi-Z materials effort at BNL (Abdul Rumaiz)
HiZ materials and MM-PAD upgrades @ Cornell (Sol Gruner)
ePix potential commercialization (BES/MSD)
Timepix/MCP (Tremsin)
Status:
RA: Added to 'buy' list....need new base plate ($4k??), stages, BIO is in review... JF mech design underway Wavefront sensor work with Matt Seaburg. JF interface document development....where do we want to draw the line? MEC EMP testing CSPAD/ePix Date TBD
PH: EMP testing confusing, but 10k didn't fall over. CSPAD Quad given to TID for isolation/testing as next stage. Marc Foster: no obvious solution for fibers. ePix10k and ePix100 setup on XCS for software development. Paper published in SPIE conference proceedings. CSPAD going on eBay....better use??
KN: Wave8 for FIM CDR 5/30. Much NEH crap transport. Laser setup this week.
KZ: Working RIXS CCD procedure. ePix10k requires new MPODS, working issue
Laser SoP moving forward...set up so no laser glasses necessary...administrative controls OK
eGun interlock doc (2wk.)
Status documentation/procedures effort
How many fibers do we have to run to B84?? Work with Jana to tell Mark Foster (2wk)
5 min
Budget Update
mmck
ASC: $253k spent, asking PA account be closed.
Ops has significant M&S spending we need to plan:
EPIX Support $40K Other Support $20K Research $36K I&D $80K OIP $20K Total $196K (only about ~$80k of the TID spending above would be M&S).. Ideas?
Ops: $233k spent, $925k remains (Feb Actuals, incl. I&D, detector research, mgmt.), $28k under plan
15 min
Review ASC First Projects
all
Coordinate/update lab schedule.
10 min
Any other business
Action items
Philip Hart to determine the necessary fiber count to B84 in consult with Mark Foster