Time | Item | Who | Notes |
---|
30 min | Status | All | Single 90 min meeting going forward, rather than two 60min meetings? ePix Update: - Met with Chris Kenney last week regarding sparing strategy for ePix support. TID-AIR has proposed some funding options to consider:
- $60k for parallel ePix10k flipchip bonding run (FY19)
- $3k for metrology of existing ePixBig (FY19)
- $75k for two new ready-spare ePix100 cameras and additional modules for repairs, depending on yield. (FY19)
- $5k to build a case for the existing ePixBig with the changes requested by HXR for the new ePixBig (FY19)
- $25k to formally release ePixBig drawings/models in TeamCenter (FY20)
- $1k for a pair of pelican cases for the ePixBigs (FY19)
- Total for FY19 $145k. I'm inclined to fund all o this spending out of a combination of OIP and Infrastructure....thoughts?
- Testing has begun on ePixHR: Chip is alive and registers can be programmed...more results soon. Rebaseline after we know whether it works.
- SXR requirements doc singed off.
- TES re-baseline document not yet forwarded to LCLS mgmt. I'm late on this.
- Project document for MCP/TImepix is now in review with Anton. Need to get funding rolling, and to set up a visit to kick this off.
- Traveled to BES and APS last week. There are several collaboration opportunities that we need to look into:
- Hi-Z materials effort at BNL (Abdul Rumaiz)
- HiZ materials and MM-PAD upgrades @ Cornell (Sol Gruner)
- ePix potential commercialization (BES/MSD)
- Timepix/MCP (Tremsin)
Status:
- RA: Added to 'buy' list....need new base plate ($4k??), stages,
BIO is in review... JF mech design underway Wavefront sensor work with Matt Seaburg.
JF interface document development....where do we want to draw the line? MEC EMP testing CSPAD/ePix Date TBD - PH: EMP testing confusing, but 10k didn't fall over.
CSPAD Quad given to TID for isolation/testing as next stage. Marc Foster: no obvious solution for fibers. ePix10k and ePix100 setup on XCS for software development. Paper published in SPIE conference proceedings. CSPAD going on eBay....better use?? - KN: Wave8 for FIM CDR 5/30.
Much NEH crap transport. Laser setup this week. - KZ: Working RIXS CCD procedure.
ePix10k requires new MPODS, working issue - Laser SoP moving forward...set up so no laser glasses necessary...administrative controls OK
- eGun interlock doc (2wk.)
- Status documentation/procedures effort
- How many fibers do we have to run to B84?? Work with Jana to tell Mark Foster (2wk)
|
5 min | Budget Update | mmck | - ASC: $253k spent, asking PA account be closed.
- Ops has significant M&S spending we need to plan:
Ops: $233k spent, $925k remains (Feb Actuals, incl. I&D, detector research, mgmt.), $28k under plan
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business | | |