Date

Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minStatusAll

Single 90 min meeting going forward, rather than two 60min meetings?

ePix Update:

    • Met with Chris Kenney last week regarding sparing strategy for ePix support. TID-AIR has proposed some funding options to consider:
      • $60k for parallel ePix10k flipchip bonding run (FY19)
      • $3k for metrology of existing ePixBig (FY19)
      • $75k for two new ready-spare ePix100 cameras and additional modules for repairs, depending on yield. (FY19)
      • $5k to build a case for the existing ePixBig with the changes requested by HXR for the new ePixBig (FY19)
      • $25k to formally release ePixBig drawings/models in TeamCenter (FY20)
      • $1k for a pair of pelican cases for the ePixBigs (FY19)
      • Total for FY19 $145k. I'm inclined to fund all o this spending out of a combination of OIP and Infrastructure....thoughts?

    • Testing has begun on ePixHR: Chip is alive and registers can be programmed...more results soon. Rebaseline after we know whether it works.
  • SXR requirements doc singed off.
  • TES re-baseline document not yet forwarded to LCLS mgmt. I'm late on this.
  • Project document for MCP/TImepix is now in review with Anton. Need to get funding rolling, and to set up a visit to kick this off.

  • Traveled to BES and APS last week. There are several collaboration opportunities that we need to look into:
    • Hi-Z materials effort at BNL (Abdul Rumaiz)
    • HiZ materials and MM-PAD upgrades @ Cornell (Sol Gruner)
    • ePix potential commercialization (BES/MSD)
    • Timepix/MCP (Tremsin)

Status:


  • RA: Added to 'buy' list....need new base plate ($4k??), stages,
    BIO is in review...
    JF mech design underway
    Wavefront sensor work with Matt Seaburg.
    JF interface document development....where do we want to draw the line? MEC EMP testing CSPAD/ePix Date TBD
  • PH: EMP testing confusing, but 10k didn't fall over.
    CSPAD Quad given to TID for isolation/testing as next stage.
    Marc Foster: no obvious solution for fibers.
    ePix10k and ePix100 setup on XCS for software development.
    Paper published in SPIE conference proceedings.
    CSPAD going on eBay....better use??
  • KN: Wave8 for FIM CDR 5/30.
    Much NEH crap transport.
    Laser setup this week.
  • KZ: Working RIXS CCD procedure.
    ePix10k requires new MPODS, working issue
  • Laser SoP moving forward...set up so no laser glasses necessary...administrative controls OK
  • eGun interlock doc (2wk.)
  • Status documentation/procedures effort
  • How many fibers do we have to run to B84?? Work with Jana to tell Mark Foster (2wk)
5 minBudget Updatemmck
  • ASC: $253k spent, asking PA account be closed.
  • Ops has significant M&S spending we need to plan:
    • EPIX Support $40K
      Other Support $20K
      Research $36K
      I&D $80K
      OIP $20K
      Total $196K (only about ~$80k of the TID spending above would be M&S).. Ideas?

  • Ops: $233k spent, $925k remains (Feb Actuals, incl. I&D, detector research, mgmt.), $28k under plan
15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business  

Action items

  • Philip Hart to determine the necessary fiber count to B84 in consult with Mark Foster