You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Sometimes the instrument specialists give us new calibrations. Usually just a dead strip list for TKR, 3 (asym, MeV/DAC, peds) at a time for CAL. They need to be put in a standard place, registered in the calibration DB, and set active. This requires picking a time when validity switches from the previous set to the new one. We want this to happen between runs. The gaps between non-SAA runs are short, and CALDB doesn't do leap seconds, so I put the transitions near the middle of an SAA passage - the first one after the last run that we have data for.

Step-by-step guide

  1. Copy files to the "normal" place (if the instrument people haven't already):
    • TKR: $LATCalibRoot/TKR
    • CAL: $LATCalibRoot/CAL/p7repro
  2. Figure out the transition time:
    1. Go to the data processing page.
      1. Find the most recent run. It will be at the top, unless deliveries have arrived out of order.
      2. Click on the run number.
      3. Note the start time.
    2. Go to the mission planning timeline

 

  • No labels