SLAC End Station A (ESA) Test Beam (ESTB)

The SLAC End Station A Test Beam (ESTB) was re-establishing in 2014 to take small fraction of SLAC LCLS beams into End Station test beam line. The operation is largely parasitic to the LCLS operations with electron beams in the 5-13 GeV range depending on the LCLS operation energy. From the FACET/ESTB portal, you can navigate to info on proposals, new user registrations etc. ESTB beam schedule mostly just follow the LCLS Run schedule. The CALADIUM EUDET telescope owned by Carleton University has been installed at the end of ESTB as a precision tracking telescope with 6 planes of CMOS/MIMOSA sensors (1152x576 18.4x18.4um pixels) with ~3 micron spatial resolution. User Device Under Test (DUT) can be mounted on a movable stage in the middle of the telescope. For ATLAS pixel test beam users, a HSIO2/RCE based DUT readout will be provided as a standard readout utility.     

ATLAS Test Beam Proposals and Sessions

Current proposals: 

Scheduled sessions:

The list of sessions below may be incomplete (welcome to add missing sessions). Links behind each session dates below navigates to activities on individual sessions. In case of confluence wiki access issue in either viewing or editing the Event log page yourself, if only needs a trivial registration to gain access.  

Operations Info

ExtensionContactExtensionContact
2151Main Control (MCC) Operator8556Carsten Hast
2811ESA counting house2084Keith Jobe

4299

Radiation Physics (for ESA exit survey)5200Mike Dunning
4371End Station A floor2284Su Dong
2551Main Gate security guards (door keys)3912Matthias Wittgen
 Su Dong cell phone:  650 430 4470  
 Timon Heim cell phone: 510 944 9508  
 Ben Nachman cell: 402 689 8125  

ESTB DAQ Configuration

The Caladium telescope control and DAQ is handled by the National Instrument (NI) crate which collects data via the TLU with data producers from the telescope itself and the DUT. The DUT readout is upgraded to a simpler arrangement with just the HSIO-II controlled by the ESADUTDAQ1 server node (replacing ESA-USER02) via a direct private ethernet link. Due to the very short ESTB bunches, there is no need for additional triggers within the bunch and the DAQ is simply driven by the bunch crossing beam trigger. The SWH-B061-NW01 network switch in the middle of the ESA hall support the ESA-RESTRICTED local network 172.27.104.* (port 25-48) where both the NI crate and ESADUTDAQ1 reside on. The EUDAQ console PC AR-EUDAQ in the ESA Control Room and several other nodes e.g. AR-ESAUX2 are connected to the ESATESTFAC public subnet 172.27.100.* (port 1-24) on the same switch, but can also see the local ESA-RESTRICTED subnet. The connection from the NI crate and ESADUTDAQ1 to the switch are routed through the Belgen patch panel inside the tunnel near the optical table.        

Telescope operation (EUDAQ v1.5)

0. In ESA:

- Start chiller: 18 Celsius
- Switch on power supply: 8V constant --> check 2.0 A
- Switch on NI crate and TLU
1. Start sensors
- Remote access to NI crate:
-- Open Terminal
-- source access_NI_crate.sh
-- Login: telescope PWD: telescope+
- Start MI26.exe (upper icon on the NI crate Desktop)
-- Open .mcf threshold file, typically 6 (CALADIUM config files are in C:\opt\mimosas\config_files)
-- Press "Reset" --> 2.0 Amps
-- Press "All" --> 2.8 Amps
-- Press "Read" --> 2.8 Amps
-- Press "Start" --> check 3.6 Amps
2. Open Labview FPGA interface on NI crate, if not already open
- Double click MimosaDAQ (second upper icon on the Desktop)
3. Start EUDAQ on AR-EUDAQ:
- Open a second Terminal
- cd eudaq (points to /opt/install/eudaq/eudaq-1.5-dev)
- ./STARTRUN
- wait approx. 20 sec. until all Connections are green (OK)
4. Open TLUproducer on NI crate
- Double click start_EUDAQ_tlu (bottom icon on the Desktop), a blank terminal pops up
--> check in eudaq Run Control, that Produce TLU is connected
5. Start DUT data producer(s) if not running telescope by itself.
For standard RCE based DUT readout, this should be just starting rceOfflineProducer on esadutdaq1.

6. Configure EUDAQ in eudaq Run Control
- select Config file (Caladium only exercise config: no-beam: ni_autotrig; beam: ni_coins)
- Press Config
- wait till all Connections are green (OK)
7. Start Run
- Press Start (wait till all green)
--> check, that Trigger and Event Built numbers are increasing
--> check OnlineMonitor, and reset (upper left x-button)
8. Stop
- Re-configure (5.) and Re-Run (6.)
OR
- Terminate and press "Reset" in MI26.exe at NI crate to stop sensors --> check 2.0 Amps

 

Pixel DUT RCE Readout 

While the DUT readout can be of variety of ways, the RCE readout setup is provided for at least ATLAS pixel users as a standard utility. As of Apr/2016, the DUT RCE readout is upgrading from old the Gen-1 RCE + HSIO setup to a simpler HSIO-II setup, with the dedicated ESADUTDAQ1 Sun server residing the beam tunnel near the EUDET area as the DUT RCE readout host. HSIO-II has the DTM mezzanine with the Gen-3 ZYNQ based RCE operating an Arch-Linux based ARMS CPU that communicates with external world via its native 1Gb/s Ethernet. More general information on HSIO-II/RCE can be found on the RCE Development Lab Twiki.

If you ar not running the system from the ESA console next to the EUDET, but from some public nodes at SLAC, you need to first hop onto an ESA public machine on the 172.27.100 subnet and login as yourself e.g.

  ssh -Y ar-esaux2   

At least calibration actions will need X window displays so that the -Y qualifier through out is necessary. Then continue to hop onto the DUT readout node as dedicated user tbslac:

  ssh -Y esadutdaq1 -l tbslac
  cd ~/daq/rce 
  source ./scripts/setup-gen3.sh

For normal EUDAQ data taking, you need to start and announcing RCE DAQ as a data producer to EUDAQ run control node ar-eudaq with just one command:  

  rceOfflineProducer -r 0 -d 172.27.100.8     

If everything is run smoothly, once you brought up the overall DAQ with EUDET through EUDAQ run control node ar-eudaq, you should see the RCE data producer show up in the producer list. If RCE producer seems to be not behaving correctly even upon restarting, you can reboot the HSIO from the ESADUTADQ1 console with the command:

  rebootHSIO -r 0  

After ~ half a minute, you can restart the rceOfflineProducer as instructed above. In the very rare event that this still doesn't get you out of trouble due to the problem with the FPGA side of HSIO-II, you can power cycle the HSIO-II remotely from the EPICS controlled power strip which has a dedicated socket for the HSIO-II. 

Pixel Calibrations      

Before taking an serious beam runs, it is advisable check the modules through calibration. Some sensors are known to need different threshold tunes at different temperatures, so that some calibration runs are expected to be a frequent activity between beam runs. The HSIO reboot will automatically bring up the calibserver on the RCE side to be always ready for it. If you suspect the calibserver ran into trouble or something messed on the RCE, doing a rebootHSIO may be the simplest way to recover. After the regular login process to ESADUTDAQ1, you can launch calibration GUI from ~/daq/rce after executing the ./scripts/setup-gen3.sh once for the session:

     calibGui & 

The operations steps of calibrations are explained briefly in the RCE pixel calibration instruction Twiki while the functionality details of the calibrations are described in the ATLAS pixel calibration manual.  The most commonly used are DIGITAL_TEST and THRESHOLD_SCAN. The new Gen-3 HSIO-II based readout uses a simplified process communication scheme which limits the calibration to one instance of calibserver on RCE and one instance of calibGUI on UNIX host ESADUTDAQ1. It will reject duplicate starters and issue an error message. In case you wanted to run caliGUI from the ESA pit but another session is open in the counting house with noone attending, you can just kill it after checking the process list with ps. The default calibration repository is under /home/tbslac/pixelrce/rce/moduleconfigs/. 

In case you want to debug some calibration related problems that can benefit e.g. looking at the calibserver console printout, you can logon to the rce from an esadutdaq1 window:

    ssh root@rce0    (pw=root)
    rce> export PATH=/root/pixelrce/bin:$PATH; export LD_LIBRARY_PATH=/root/pixelrce/lib:$LD_LIBRARY_PATH
    rce> calibserver 

DUT DAQ Configuration

The DUT integration is controlled through setup of EUDAQ configuration files with names like ni_coins.cfg etc. residing in /home/tfuser/eudaq/conf folder (also Desktop folder) on the EUDAQ console node ar-eudaq. The data logging also goes to the data directory in the same folder. These configuration info are not only passed on to the RCE producer to configure the DUT, but also interpreted by the EUDAQ to derive online monitoring for the DUT together with the telescope. A general example of telescope + DUT configuration can be found here (not SLAC ESTB), while some explanations of the various configuration items related to the RCE producer can be found here.  

 

Pixel DUT YARR Readout

In addition to RCE, we also have integrated the YARR (Yet Another Rapid Readout) system into the EUDAQ system in ESA.  Here are some instructions.

    ssh -XY pixel@esadutlbnl1
    (ask Timon or Ben for the password or don't close the terminal)
    cd yarr-eudet/eudaq
    bin/yarr-fe65p2-producer -n YARR -r 172.27.100.8

In addition to starting the producer, one needs to modify the DUTMask in the .conf.  Add +4 to include YARR.  There is no need to add anything else because the configuration is currently hard-coded into the producer (and the Latency = 43 and Trig Count = 3 seem good so there should not be a need to touch this).

To fully kill this producer if it gets stuck or when terminating the run control, do a ctrl+Z to move it to the background and then kill in the usual way with ps ux | grep yarr.  Then, kill -9 <pid> where <pid> is the id of the producer from the ps ux.

After stopping a run, there will be some offline plots in ~/yarr-eudet/eudaq/data.  There is also a simple script for offline analysis:

    cd ~/yarr-eudet/eudet
    ../src/bin/read_rawData data<file>.raw #<file> is <Dutname>_<runnumber>

 

Infrastructure Utilities

EPICS Control Interface

The ESTB EPICS control/monitoring interface that provides some important general utilities, such as the XY stage remote control to align the telescope and DUT to the beam, and remote controlled individual power strip socket on/off that can come handy for remotely powering off detectors and rebooting DAQ components and computers inside ESA, as well as web cams. To access the ESTB EPIC panel:

 

  • login to a public domain ESTB node (e.g. ar-esaux3). If login from a remote computer, you need to use ssh -Y option to make sure the EPICS X display can come back to your terminal.
  • source /afs/slac/g/testfac/home/esa/setupESA 

(if you are using the ar-esaux3 console in the ESA control room locally, it's likely that it was already logged in as tfuser with this setup already done)

  • estbgui &          

 (this last command should bring up the ESTB EPICS panel on the right)


For ATLAS test beam operations with Caladium, the dedicated T-539 panel contains some of the most relevant sub panels.

Beam Trigger

The "Triggers" panel on the ESTB EPICS GUI brings up the Experimental Triggers panel where channel 10 (Si Tracker Caladium) controls the beam trigger. The trigger NIM signal is carried to Caladium with a green BNC cable to a LEMO connection into the TLU Chan 0 PM in trigger port. The Delay value is the critical control of timing that DUT is very sensitive to and vary significantly between different types of DUTs, while EUDET seems to work with a wide range of delays automatically. The Trigger width parameters didn't appear to have much effect on anything.

Beam Dump Monitor

The beam dump monitors, Lead Glass (LGdump) dump, and Front/Read dumps are a key monitoring tool to give direct look at the beam intensity. ESTB GUI "Scope ESA" panels is particulary useful as a standard monitor for instantaneous beam status as scope pulses. "ADC Chanls"/"Histograms" panel displays the instantaneous values and distributions of energy measurements of various dumps. "HV SY403" can be used to adjust HV values for different intensity measurements.   

Time History Chart

The "StripTool" panel is a very handy general utility that allows you to keep track of the time history of any variables in EPICS. For example the DUT region temperature sensors are particularly useful in cooled sensor operations From the StripTool Control panel, you can pick from any EPICS display panel an variable by clicking the middle button of the mouse over the displayed value of that variable which will bring up a signal name string which can be dragged into the StripTool "Plot New Signal" selection field to add the signal to the time history strip chart.  

The T-539 panel

The T-539 panel contains most of the relevant displays for Caladium telescope and ATLAS DUT.

Caladium Beckhoff

XY stage motors:  The telescope + DUT assembly are mounted on a remote controllable base "coarse" XY control  (X=horizontal transverse to beam; Y=vertical) to align the whole assembly wrt beam. During new test beam periods, this is typically done initially using a pair of alignment lasers in conjunction with fiducial markers to center to expected beamline within a few mm. The vertical position is gauged by a laser mounted on the tunnel side wall. The horizontal position is gauged by another laser hanging the ceiling near the side entrance. Once positioned close enough, the refined alignment is done with the beam data in telescope. For both laser alignment and beam alignment, the position adjustments for the whole telescope (including DUT mounted within it) is done with the dedicated Caladium XY stage Beckhoff26 subpanel shown on the right. The base XY stage for the whole telescope + DUT is controlled by the "coarse" X,Y adjustments. +X is pointing away from the ESA entrance gate; +Y is pointing up. The Spring/2016 upgrade added a "fine" XY stage for the DUT to allow additional adjustments of the DUT with respect to the telescope. There is an additional optional DUT rotational stage control. 

Temperature

The Caladium upgrade also added some temperature sensors that can be plugged into desired parts of the DUT setup. The displays for them are on the "KL3314 temp" tab of the Beckhoff panel.   

Remote Power Strip Control

The new T-539 panel has a sub panel contains the individual socket controls for the dedicated power strip on the Caladium+DUT electronics/DAQ rack. Clicking on individual channel channel's "Reboot" button will recycle power on that channel. Some channels may automatically flip the state to green after a brief moment, others may need deliberate push on the state button to reenable. The assignments of the channels for the May/2016 T-539 run is shown on the right as an example. Using the terminal in the ESA counting house logged in as tfuser anyone update the channel titles themselves.  

Useful links

SLAC FACET/ESTB portal  |  ESTB portal (including beam schedule) | ESTB new user registration | 

EUDET Telescope User Manual  |  DESY EUDET support page |  EUDAQ-Producer-Software.docx  | 

Photo Galleries:  Caladium installation Oct/2015-Jan/2016  | May/2016 T-539

ESTB web cams (only within SLAC network): Ceiling beam view | DUT overhead | Rack power supply | DUT side view | `

ATLAS test beam / pixel documentations: ATLAS pixel test beam Twiki | Pixel calibration manual

Test Periods: 2016-May-July | 2016-Jan |  ITk 2015-Sep5 |  ITk 2014-SLAC  |

  • No labels