Run program for GSI beam test
Assumption is to take data at 25Hz average (100Hz average rate * 1/2 duty cycle from accelerator * 1/2 duty cycle from therapy parasitic mode)
Purpose |
preferred schedule |
Ion |
Energy |
Rate on CU |
Beam focus |
Trigger |
notes |
reference |
---|---|---|---|---|---|---|---|---|
Test multiple trigger engines prior to beam |
nov 17 |
NA |
NA |
NA |
NA |
all BTs |
change CNO thresholds, periodic frequency |
DAQ team |
Monitor beam rate and conditions |
nov 18, 8-11 |
C |
1.5Gev/n |
10-1000Hz |
play with focus to change beam intensityon CU |
BT53 |
verify count rate on external trigger, set it to ~100Hz. |
all |
0 degree configuration |
nov 18 11-16 |
C |
1.5Gev/n |
10-100Hz-1KHz |
nominal |
BT50, BT51, BT54 |
per BT type collect: |
|
Tracker saturation |
nov 18 16-18 |
C |
1.5Gev/n |
10-1KHz |
nominal + focus on CU |
BT3 |
take runs with TKR trigger only vs beam rate (10-100-1K) |
|
CAL calibration comparison with previous results |
nov 18 18-20 |
C |
1.5GeV/n |
100Hz |
far and near focus |
BT50, BT51 |
move CU as to have beam on tower1 to avoid TKR in the line |
CAL team |
30 degree |
nov 18 20-21 |
C |
1.5GeV/n |
100Hz |
nominal |
BT50 |
move CU at 30 degrees, take some events to check ACD CNO threshold for new hit tiles |
|
30 degree configuration |
|||||||
nov 18 21 - nov 19 2 |
C |
1.5GeV/n |
100Hz |
nominal |
BT50, BT51, BT54 |
per BT type collect: |
|
60 degree or twr 3 configuration? |
nov 19 2-7 |
C |
1.5GeV/n |
100Hz |
nominal |
BT50, BT51, BT54 |
|
|
Energy scan |
nov 19 |
C,Xe |
600MeV/n - 1.5GeV/n in steps |
10-1000Hz |
far and near focus |
BT51 |
attempt to simulate different ions by varying ionization energy |
nicola |
Secondary ions with target |
nov 19 |
Xe |
1.5GeV/n |
10-1000Hz |
far and near focus |
BT50 |
attempt to get different ions by shooting beam through a target - need verification with GSI people |
benoit |
Charge injection in CAL with beam |
nov 19 |
C |
1.5GeV/n |
10-1000Hz |
far and near focus |
BT50 |
check pedestal restoration with beam ON, explore different beam rates; can use existing CalibGenCAL script |
sasha |
Charge injection in TKR with beam |
nov 19 |
C |
1.5GeV/n |
10-1000Hz |
far and near focus |
BT50 |
check rate effect in TKR signal; must identify CI script and plots to monitor |
leon, TKR team |
scintillation measurement in CDE |
nov 19 |
C, Xe? |
1.5GeV/n |
100Hz |
|
NA |
place another detector upstream and monitor signal pulse |
benoit |