Run program for GSI beam test
Purpose |
preferred schedule |
Ion |
Energy |
Rate on CU |
Beam focus |
Trigger* |
Runs** |
notes |
preliminary analysis |
---|---|---|---|---|---|---|---|---|---|
Test multiple trigger engines prior to beam |
nov 17 |
NA |
NA |
NA |
NA |
all BTs |
|
change CNO thresholds, periodic frequency |
|
Monitor beam rate and conditions |
nov 18, 8-10 |
C |
1.5Gev/n |
50-500Hz |
play with focus to change beam intensityon CU |
BT53 |
2519-2522 |
spill is 6s long. monitor shows counts vary between 50-500Hz. |
|
0 degree configuration |
nov 18 |
C |
1.5Gev/n |
100-200Hz |
nominal |
BT50, BT51, BT54 |
2527-2534 |
250Kevts at ~200Hz |
CAL studies: |
30 degree |
nov 18 |
C |
1.5GeV/n |
260Hz |
nominal |
BT50, BT51, BT54 |
2535-2537 for beam tuning |
660Kevts |
|
-60 degree |
nov 18 |
C |
1.5GeV/n |
270Hz |
nominal |
BT50, BT51, BT54, BT56 |
2550-2553 |
645Kevts |
beam through tower3 side, no ACD tile; BT50, BT51 have a CNO trigger engine which is not satisifed - most events are therefore read with the std engine auto-range, ZS associated with any other trigger than CNO |
0 degree |
nov 18 7PM |
C |
1.5GeV/n |
270Hz |
nominal |
BT3,BT50, BT51 |
|
2572 with BT3 (TKR only trigger) - 250Kevts |
noticed larger fraction of TEM errors (from 2% to 3.5%) - probably due to higher rate in first part of spill when getting beam back from therapy |
0 degree Xe |
nov 19 |
Xe |
1GeV/n |
200hZ |
nominal |
BT50-BT51 |
2577-2581 |
played with fifo settings to reduce fifo full errors |
2577 very high rate (10KHz) |
0 degree Xe on Al target |
nov 19 4.30AM |
Xe |
1GeV/n |
200Hz-1KHz |
nominal |
BT53 with different FIFO full settings |
2582-2594 |
attempt to get different ions by shooting beam through a target |
2582 1.6KHz rate |
scintillation measurement in CDE |
nov 19 |
Xe |
1GeV/n |
200Hz |
nominal |
NA |
NA - contact Benoit to get data |
place a CAL cristal in front of CU and record signal pulse |
clear saturated signal from Xe, secondary peaks visible |
charge injection with beam |
nov 19 |
Xe |
1GeV/n |
600-1000Hz |
nominal |
CalibGen |
Xe beam: 2595-2607 |
performed with beam while taking scintillation measurement |
|
Very low rate |
nov 19 |
C |
1.5GeV/n |
as low as possible |
nominal |
BT58 |
2627 |
~15Kevts |
|
0 degree |
nov 19 |
C |
1.5GeV/n |
~600Hz |
nominal |
BT50,BT51,BT53 |
|
compare with runs taken before Xe beam |
not performed |
* see here for full details on trigger configurations
** 70000 omitted from run number
back to GSI operations page