Program
day 12 -swing 12
particle |
energy |
trigger |
events |
purpose |
mode |
---|---|---|---|---|---|
e |
2.5 |
S0+S2+NOSh+NOS3+C1+C2 |
2M |
full brem at 2.5GeV - configuration 2 |
complete CU scan position 2 up to required statistics |
e |
2.5 |
S0+S2+S4+NOSh+NOS3+C1+C2 |
100K |
scan CU position 3 (TBD) |
sync with AD, magnet at 600A |
e |
0.5 |
S0+S2+S4+NOSh+NOS3+C1+C2 |
25K |
tagged photons from 0.5GeV beam |
sync with AD, magne at 120A, check empty events in the CU-CAL (gammas in the dump?); if nb of empty evts in the CAL is low compete the scan getting 100K evts |
e |
2.5 |
S0+S2+NOSh+NOS3+C1+C2 |
10K |
direct e in the CU to check beam position |
sync with AD, check position of beam |
e |
2.5 |
S0+S2+S4+NOSh+NOS3+C1+C2 |
100k |
scan CU position 4 (TBD) |
sync with AD, magnet at 600A |
|