Program

Swing 11 - night 12 

 particle

 energy

trigger

events

 purpose

mode

 e

1

 S2+S4+NOSh+NOS3+C1+C2

 100K

 1 GeV photon tagged

magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each

 

 

 

 

 

 move CU in position 2 (x=200,Y=13.20,Z=-48, angle=30)

 e

1

 S2+S4+NOSh+NOS3+C1+C2

 130K

 1 GeV photon tagged - CU position 2

magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each (more events needed as we realize the beam is larger and we get unradiated e)

 e

1

S0+S2+NOSh+NOS3+C1+C2

 100K

1GeV e in the CU for calibration

magnet off, NO AD sync

 e

2.5

S0+S2+NOSh+NOS3+C1+C2

 10K

 check beam position after changing energy

magnet off, sync with AD

 e

2.5

S0+S2+NOSh+NOS3+C1+C2

 2M

 full brem at 2.5GeV - configuration 2

NON synchronized with AD; scan CU position 2, magnet at 600A


  • No labels