Program

Postponed from for day shift 9/8 to 10/8 swing because of non availability of beam on 9/8

 particle

 energy

trigger

events

 purpose

mode

 e

 2.5

 S0+S2+NOSh+C1+C2

 10K

check beam position after restart

same CU configuration, change trigger, sync with AD

 None

none

 

 

 pedestal run for CAL

CU BT22 

 e

 2.5

 S0+S2+NOSh+C1+C2

 100K

 e calibration

same CU configuration, magnet off, e trigger, NO AD

 e

 1

 S0+S2+NOSh+C1+C2

 100K

 1GeV e in the CU for calibration

magnet off; check position of beam wrt to dump

 e

 0.5

 S0+S2+NOSh+C1+C2

 10K

 0.5 GeV e in the CU for calibration

magnet off; check position of beam wrt to dump

 e

1

 S2+S4+NOSh+C1+C2

 100K

 1 GeV photon tagged

magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each

 e

1

 S2+S4+NOSh+C1+C2

 100K

 1 GeV photon tagged - CU position 2 (TBD)

magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each

 e

1

 S2+NOSh+C1+C2+Sback

 10K

test to redefine full-brem photon trigger to maximize  efficiency

add Sback after tagger and in trigger, take data with no AD

 e

1

S2+NOSh+C1+C2

 10k

 test to get full-brem+AD

read sync AD but full-brem trigger; test data readout rate and synchronization

 e

1

S0+S2+NOSh+C1+C2

 100K

1GeV e in the CU for calibration

magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each

 e

2.5

S0+S2+NOSh+C1+C2

 10K

 check beam position after changing energy

magnet off, sync with AD

 e

2.5

S0+S2+NOSh+C1+C2(Sback?)

 2M

 full brem at 2.5GeV - configuration 2

NON synchronized with AD; scan the next position of the CU (TBD)

 

 

 

 

 

 