You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 180 Next »

Documents for Type-I services construction are gathered in this page:

Bundle Production

The production table can be found HERE.

 Below is the pre-production table.

 

Serial Number

Date Shipped 

Stave

Type

Length

AXON

DCS

L Potting

L AXON
(head)

L Data

Comments

Pre-Production          

IBL-TypeI-01

April 2013

 

 

n/a

 

n/a

 

 

 

Electrical cable

IBL-TypeI-02

01 June 2013

 

 

Long

 

Humidity

 

 

 

Pre-production at CERN, substitute power connector

IBL-TypeI-03

15 June 2013

 

 

Long

 

Humidity

 

 

 

Pre-production at CERN, substitute power connector

IBL-TypeI-04

30 June 2013

 

 

Long

 

Humidity

 

 

 

Pre-production at CERN, substitute power connector

IBL-TypeI-05

23 July 2013

 

 

Long

 

Humidity

 

 

 

Pre-production , substitute power connector

IBL-TypeI-06

19 August 2013

05

02

Long

 

Humidity

2460

3487

4960

Bad AXON Connector.

IBL-TypeI-07

10 Oct. 2013

05

02

Long

003

Humidity

2458

3483

4946

AWG22 Wires for LV.

Material Inventory List

Material

Part Number

Needed

In hands

Comments

Potting ferrule

n/a

80

100

 

Connector Board

n/a

40

50

 

ConnB Shells

n/a

40

8

 

ConnB Shell Nuts

 

80

 

 

ConnB Square Nuts

n/a

40

41

 

ConnB Ferrule

n/a

40

45

 

Cable Board

n/a

40

50

 

CB NTC

Panasonic ERT-JOEG103FA

40

100

 

Cooling Pipe NTC

Semitec 103-JT-025

20

100

 

PP1 NTC

Semitec 103-AT-2

20

100

 

CB Humidity Sensor

 

20

84

 

Data bundle Braid

 

 

 

 

Data bundle Kevlar

 

 

 

 

Shrink tube

 

40x2x4cm=320cm

 

 

Data AWG36 wires

MWS

17 rolls (1000 feet)

29

 

Data AWG28 wires

MWS

15 rolls

14

 

AXON AWG22

MWS

25 rolls

25

 

AXON AWG28S

MWS

3 rolls

3

 

AXON AWG26

MWS

1 roll

1

 

AXON AWG32

MWS

14 rolls

14

 

Q/A Documents:

BareWireResistance.xlsx
LV_drop.xlsx
Touch-1 Resistance Measurements
Data Transmissions LogFiles

Documentations:

Type-I-QA-20141102.docx    [Touch1 pictures: 1, 2, 3, 4, 5, 6, 7 ]
distance_IPT_12June.jpg   ATUIBLP_0034_12June.pdf   ATUIBLP_0070_12June.pdf
Type1_assembly_V7.docx  [V6] [V5, Comments] [V4]  [V3]
Type1 Potting Procedure
IBLType1Cable.ver5.pdf  [V5 change ]
IBL-type1-service_19c.xlsxIBL-type1-dimension.xlsx
Installation Barber Pole pictures: [1, 2, 3, 4, 5 ]
SLAC-Prod.xlsx

Contacts / Practical Info

Building 33 clean room phone ext: x8951

 

  • No labels