Building 33 Clean Room Bundle Assembly Operation

  • Tailgate Meetings Minutes:
    • 23 September 2013: we reviewed the various safety aspects of the work in building 33. We discussed the work plan for the week: a) finish the bundling and jacketing of Cable 23 that is on the polls, and then make Cables 24/25 and start Cables 26/27. Two cables are made at the same time on the polls. b) Tan will solder AXON-06 and do the stripping/soldering of data-Cables 22/23/24/25. The Tailgate Release Form can be found here: TailgateSafety_23Sept13.pdf .
    • 30 September 2013: No specific safety issues came up this week. Work plan for the week: a) assemble Data-Cables 28/29 and 30/31 and b) Tan to solder Data-Cables 26/27 and possibly 28/29. The Tailgate Release Form can be found here: TailGateSafety_30Sept13.pdf .
    • 07 October 2013: No specific safety issues came up this week. Work plan for the week: a) assemble Data-Cables 30/31 and 32/33 and b) Tan to solder Data-Cables 28/29 and 30/31. The Tailgate Release Form can be found here: TailGateSafety_07Oct13.pdf .
    • 14 October 2013. No specific safety issues came up this week. Work plan for the week: a) assemble Data-Cables 34/35 and 36/37 and b) Tan to solder Data-Cables 32,33,34 and 35. The Tailgate Release Form can be found here: TailGateSafety_14Oct13.pdf .
    • 22 October 2013. An important safety issue was raised today: in two occasions over the last three weeks, when showing up for work in the morning, Tan found the chemical stripping soldering pot turned ON, although he turned off the day before when leaving work. The following actions are taken:
      1. Notify Eliziar Ortiz, building 33 manager.
      2. Each day at end of work: unplug the soldering pot, install rope to prevent access to the soldering station and sign off checklist.

Work plan for the week: a) assemble Data-Cables 37/38 and b) Tan to solder Data-Cables 33,34,35,36. The Tailgate Release Form can be found here: TailGateSafety_21Oct13.pdf .

    • 04 November 2013: No specific safety issues came up this week. Work plan for the week: a) assemble Data-Cables 45/46 and 47/48 and b) Tan to solder Data-Cables 41,42,43 and 44. The Tailgate Release Form can be found here: TailGateSafety_04Nov13.pdf .

Building 224 Potting Operation

Environmental Compliance Checklist

  • No labels