Documents for Type-I services construction are gathered in this page:
Bundle Production
The production table can be found HERE.
Below is the pre-production table.
Serial Number | Date Shipped | Stave | Type | Length | AXON | DCS | L Potting | L AXON | L Data | Comments |
---|---|---|---|---|---|---|---|---|---|---|
Pre-Production | ||||||||||
IBL-TypeI-01 | April 2013 |
|
| n/a |
| n/a |
|
|
| Electrical cable |
IBL-TypeI-02 | 01 June 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production at CERN, substitute power connector |
IBL-TypeI-03 | 15 June 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production at CERN, substitute power connector |
IBL-TypeI-04 | 30 June 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production at CERN, substitute power connector |
IBL-TypeI-05 | 23 July 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production , substitute power connector |
IBL-TypeI-06 | 19 August 2013 | 05 | 02 | Long |
| Humidity | 2460 | 3487 | 4960 | Bad AXON Connector. |
IBL-TypeI-07 | 10 Oct. 2013 | 05 | 02 | Long | 003 | Humidity | 2458 | 3483 | 4946 | AWG22 Wires for LV. |
Q/A Documents:
BareWireResistance.xlsx
LV_drop.xlsx
Touch-1 Resistance Measurements
Data Transmissions LogFiles
Documentations:
Type-I-QA-20141102.docx [Touch1 pictures: 1, 2, 3, 4, 5, 6, 7 ]
distance_IPT_12June.jpg ATUIBLP_0034_12June.pdf ATUIBLP_0070_12June.pdf
Type1_assembly_V7.docx [V6] [V5, Comments] [V4] [V3]
Type1 Potting Procedure
IBLType1Cable.ver6.pdf [V5->V6 change] [V5 ]
IBL-type1-service_21.xlsx, IBL-type1-dimension.xlsx
Installation Barber Pole pictures: [1, 2, 3, 4, 5 ]
SLAC-Prod.xlsx