T9/PS run Daily Briefings - 3PM
July 26 - room 13-2-005
10:30 : Safety visit from CERN: minor action items being followed by Luca L.
July 27 - room 13-3-005
Program
July 28 - room 13-3-005
Communications |
- Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient; fan added to cool XY table motors. Please look at the temperature during your shift |
Online Report |
- DAQ sync studies going on
- CU: Ric investigating phasing errors |
Offline Report |
Francesco:
- pipeline nicely running
- 1st 1000 evetns in SVAC ntuple duplicated
Claudia:
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)
- MC and CU cooprdinate systems mismatch (check with Philippe)
Dave:
- no CAL-HI triggers in last night data as fhe values were saturated |
Program |
- Complete DAQ sync studies
- perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay)
- explore beam conditions
- ACD calibrations (ideally 5gev p, if NA 5gev e)
- CAL runs with e (Benoit)
- Tagger calibration start on 29 morning |
Notes |
- Fill elogbook
- Take your shifts and launch runs yourself
<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="a3fa7252-1ced-4fc4-bb8e-a4a893f156aa"><ac:plain-text-body><![CDATA[ - rcReport has wrong table positions for runs [701-736]; the right correlation table between position and run will be circulated. Please reset runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf) |
]]></ac:plain-text-body></ac:structured-macro> |
July 29 - room 32-1-A24
Program
July 30 - room 32-1-A24
Program
July 31 - room 32-1-A24
Program
August 1 - room 13-3-005
Program
August 2 - room 31-A24
Program
August 3 - room 13-3-005
Program
August 4 - room 32-S-C22
Program
August 5 - room 32-S-C22
Program
August 6 - room 31-A24
Program
August 7 - room 31-A24
Program
August 8 - room 13-3-005
Program
August 9 - room 31-A24
Program
August 10 - room 13-3-005
Program
August 11 - room 32-S-C22
Program
August 12 - room 31-A24
Program
August 13 - room 31-A24
Program
August 14 - room 31-A24
Program