Hybrid #

Received

Passive components loaded / cleaned

Sent to UCSC

APV25s loaded

Wirebonded

Tested

Results

Sent to SLAC

Glued to carbon fiber

Part of half-module

Notes

Hybrid 0

10/10/11(RH)

?

?

?

?

?

?

?

?

Half-module 0

 

Hybrid 1

10/10/11(RH)

?

2/1/12(PH,VF)

2/1/12(FM)

2/3/12(FM)

2/14/12 OM test 1

OK

2/22/12(OM)

2/23/12(TKN)

Half-module 1


Hybrid 0t

2/21/12(RH)

2/22/12(RH)

2/23/12(AG)

2/24/12(FM)

2/27/12(FM)

2/29/12 OM test 1

OK

2/29/12(OM)

3/1/12(TKN)

Half-module 2


Hybrid 1t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 3

Needs ITT connector

Hybrid 2t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 4

Solder pad ripped (dgnd), need re-work! 

Hybrid 3t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 5

Needs ITT connector

Hybrid 4t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

3/14/12(FM)

3/15/12(FM)

3/16/12 (VF, OM) 

Bad channel 210, else OK.

3/16/12 (PH)

?

Half-module ?


Hybrid 5t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

3/14/12(FM)

3/15/12(FM)

3/15/12 (VF)

V125, AVDD, GND shorts => no readout test

3/16/12 (PH)

?

Half-module ?

Pins re-crimped but still short on V125, needs fix!

Hybrid 6t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

Not loaded, loose connector wire(FM, VF)

back to SLAC

N/A

N/A

3/16/12 (PH)

?

Half-module ?


6t again



3/19/12(TKN)

3/19/12(FM)

?

? test 1

?

?

?

Half-module ?

 

Hybrid 7t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF)

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 6

 

Hybrid 8t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF)

APV0 defective? Could not set defaults => No test results.

?

?

Half-module ?

 

Hybrid 9t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) 

OK

3/18/12 (VF)

?

Half-module ?

 

Hybrid 10t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) 

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 7

 

Hybrid 11t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF)

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 8

 

Hybrid 12t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

Not loaded, b/c of gauge mark on ASIC pad.

N/A

N/A

N/A

3/18/12 (VF)

?

Half-module ?

Salvage connector?

Hybrid 13t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

?

?

?

?

Half-module ?

 

Hybrid 14t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

?

?

?

?

Half-module ?

 

Hybrid 15t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

?

?

?

?

Half-module ?

 

Hybrid 16t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

?

?

?

?

Half-module ?

 

Hybrid 17t

?

?

3/19/12(TKN)

3/19/12 (FM)

?

? test 1

?

?

?

Half-module ?

 

Hybrid 18t

?

?

3/19/12(TKN)

3/19/12 (FM)

?

? test 1

?

?

?

Half-module ?

 

Hybrid 19t

?

?

3/19/12(TKN)

3/19/12 (FM)

?

? test 1

?

?

?

Half-module ?

 

Adding a hybrid to the production database

To add a hybrid, copy the line below into the table and fill in the ?s.

|[Hybrid ?] | ? | ? | ? | ? | ? | ? [test 1|Hybrid ?, test 1]| ? | ? | ? |[Half-module ?]| |

The below link creates the hybrid page. Enter the hybrid ID once for each page that follows, and save the resulting page.

Adding a set of QA tests

On the hybrid page, click the link to add a test page. Enter the hybrid ID, test number and any notes in the template when prompted. You can also edit the page to record the APV25 settings and other test conditions in the table.

The hybrid page gets created with an excerpt box for the first test; copy the wiki markup for further tests.

The production table starts with an entry for one test; add a newline inside the table to add further tests.

Hybrid Channel Numbering

DAQ readout ordering translates to channels on the hybrids as follows:

  • No labels