LCLS Magnet Power Supply and Controls Hardware Final Design Review

Date

March 30, 2006

Time

8:00AM to 4:15PM

Location

SLAC, Building 15 Upstairs Conference Room

[ Review Committee Final Report

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/LCLS%20Review%20Committee%20Report%2020060330.doc ]

March 30, 2006

[ Response to Final Report

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/Response%20to%20LCLS%20Review%20Committee%20Report%2020060330.doc ]

April 17, 2006

Agenda

Topic

Presenter

Start Time

End Time

[ Welcome, Overview and Committee Charter

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Introduction and Overview.ppt ]

Chairman

8:00

8:30

[ Power Supplies, Racks and Cables

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Bellomo Power Supply Talk.ppt ]

Paul Bellomo - Controls and Power Electronics Department

8:30

9:30

Break

 

9:30

9:45

[ Intermediate Power Supply Controllers

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Ethernet Power Supply Controller.ppt ]

Dave MacNair -Controls and Power Electronics Department

9:45

10 45

Break

 

10:45

11:00

[ MCOR Controls

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/lcls_mgnt_ps_fdr_mar30_2006.ppt ]

Kristi Luchini - LCLS Controls Department, WBS Manager

11:00

11:30

Lunch

 

11:30

13:00

[ Sector 21 Quad Switchover

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/de Lira Sector 21 Switchover Talk.ppt ]

Antonio de Lira - Controls and Power Electronics Department

13:00

14:00

[ Hazard Analysis Summary

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Hazard Analysis Summaries.ppt ]

Paul Bellomo - Controls and Power Electronics Department

14:00

14:30

[ Cost and Schedule

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/lcls_mgnt_inj_bc1_cost_and_schedule.ppt ]

Kristi Luchini - LCLS Controls Department, WBS Manager

14:30

15:00

Break

 

15:00

15:15

Closeout

Chairman

15:15

16:15

Review Committee

Marjorie Widmeyer

SSRL Electronics Engineering

Chair

Glenn James

Lawrence Livermore National Laboratory

Dave Nelson

SLAC PPA Electronics and Software Engineering

Fernando Rafael

SSRL Electronics Engineering

Dan Shimer

Lawrence Livermore National Laboratory (retired)

Scribe

Kristi Luchini and Paul Bellomo

Charge to the Committee
The Committee will:

  • Evaluate the presented designs against LCLS physics and performance requirements
  • Determine if the degree of inter-discipline integration is adequate
  • Ascertain if the system definitions support writing software operating programs
  • Identify any other technical issues not already addressed in the presented designs.
  • Determine if the presented plans for design, procurement, and installation are reasonable
  • Identify any safety or environmental issues that require addressing
  • Write a report of comments, findings, and recommendations

Handouts

[ Injector Announcements and Agenda

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/InjectorAnnouncement and Agenda.doc ]

[ List of Magnets and Power Supplies for First Commissioning

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/List of Magnets and Power Supplies for First Commissioning.xls ]

[ VME I/O and Network Signal List

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/lcls_mgnt_inj_bc1_signal_list.xls ]

Addendums

Jul 16, 2007

K. Luchini

[ Updated List of Magnets and Power Supplies for First Commissioning

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/List of Magnets and Power Supplies for First Commissioning_V4.xls ]

Aug 8, 2006

K. Luchini

[ Updated VME I/O and Network Signal List

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list_V5.xls ]

June 14, 2006

K. Luchini

[ Updated MCOR/EPSC Controls Presentation

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/mgnt/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_ps_fdr_mar30_2006_UPDATE.ppt ]

June 8, 2006

K. Luchini

Updatted VME,PLC I/O and Network Signal List [ (word)

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list_V2.doc ] [ (excel)

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list_V4.xls ]

April 6, 2006

K. Luchini

[ Updated VME I/O and Network Signal List

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list.doc ]

April 19, 2006

P. Bellomo

[ Updated List of Magnets and Power Supplies for First Commissioning

http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/List of Magnets and Power Supplies for First Commissioning_V2.xls ]