LCLS Magnet Power Supply and Controls Hardware Final Design Review

Date

March 30, 2006

Time

8:00AM to 4:15PM

Location

SLAC, Building 15 Upstairs Conference Room

Review Committee Final Report

March 30, 2006

Response to Final Report

April 17, 2006

Agenda

Topic

Presenter

Start Time

End Time

Welcome, Overview and Committee Charter

Chairman

8:00

8:30

Power Supplies, Racks and Cables

Paul Bellomo - Controls and Power Electronics Department

8:30

9:30

Break

 

9:30

9:45

Intermediate Power Supply Controllers

Dave MacNair -Controls and Power Electronics Department

9:45

10 45

Break

 

10:45

11:00

MCOR Controls

Kristi Luchini - LCLS Controls Department, WBS Manager

11:00

11:30

Lunch

 

11:30

13:00

Sector 21 Quad Switchover

Antonio de Lira - Controls and Power Electronics Department

13:00

14:00

Hazard Analysis Summary

Paul Bellomo - Controls and Power Electronics Department

14:00

14:30

Cost and Schedule

Kristi Luchini - LCLS Controls Department, WBS Manager

14:30

15:00

Break

 

15:00

15:15

Closeout

Chairman

15:15

16:15

Review Committee

Marjorie Widmeyer

SSRL Electronics Engineering

Chair

Glenn James

Lawrence Livermore National Laboratory

 

Dave Nelson

SLAC PPA Electronics and Software Engineering

 

Fernando Rafael

SSRL Electronics Engineering

 

Dan Shimer

Lawrence Livermore National Laboratory (retired)

 

Scribe

Kristi Luchini and Paul Bellomo

Charge to the Committee
The Committee will:

  • Evaluate the presented designs against LCLS physics and performance requirements
  • Determine if the degree of inter-discipline integration is adequate
  • Ascertain if the system definitions support writing software operating programs
  • Identify any other technical issues not already addressed in the presented designs.
  • Determine if the presented plans for design, procurement, and installation are reasonable
  • Identify any safety or environmental issues that require addressing
  • Write a report of comments, findings, and recommendations

Addendums

Jul 16, 2007

K. Luchini

Updated List of Magnets and Power Supplies for First Commissioning

Aug 8, 2006

K. Luchini

Updated VME I/O and Network Signal List

June 14, 2006

K. Luchini

Updated MCOR/EPSC Controls Presentation

June 8, 2006

K. Luchini

Updatted VME,PLC I/O and Network Signal List (word) (excel)

April 6, 2006

K. Luchini

Updated VME I/O and Network Signal List

April 19, 2006

P. Bellomo

Updated List of Magnets and Power Supplies for First Commissioning