You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Integration sequence:

  • Loaded Modules on Rings
    • Welding, QC testing
  • Load Services into ¼-shell
    • Transfer ¼-shell to integration tooling
  • Load Rings into ¼-shell
    • Transfer Rings to integration tooling
    • Integrate Rings into ¼-shell
    • Welding, QC testing
  • Integrate two ¼-shells
    • QC testing
  • Package, ship 


19-0 1/4-shells in B33 cleanroom:


Past presentation: Integration Tooling and Plan at SLAC 8 Nov 2021.pptx

  • No labels