Integration sequence:
- Loaded Modules on Rings
- Welding, QC testing
- Load Services into ¼-shell
- Transfer ¼-shell to integration tooling
- Load Rings into ¼-shell
- Transfer Rings to integration tooling
- Integrate Rings into ¼-shell
- Welding, QC testing
- Integrate two ¼-shells
- QC testing
- Package, ship
19-0 1/4-shells in B33 cleanroom: