17 November 6PM

  • Current status: DAQ and connection to SLAC test with CR, stable operation overnight; multiple trigger engines defined for the run and tested. We start tomorrow at 8AM and run until sunday 8PM.
  • Discussion of Program . Main assumptions are on average rate, minimize number of changes, complete program with C before moving to Xe as C should be the main part of the run. Benoit pointed out that a reasonable time must be scheduled for Xe as fragmentation into many different seconday species require long running time to accumulate reasonble statistics: we currently scheduled 8-10 hours which should be enough. Beam tuning is the first step and will allow us to handle beam focus and rate at our wish. Shifts will be decided tomorrow after we complete the first configuration through tower 2 and have a better idea of how realistic the program is and when we should schedule the presence of specific people.
  • No labels