LCLS Magnet Power Supply and Controls Hardware Final Design Review
Date |
March 30, 2006 |
Time |
8:00AM to 4:15PM |
Location |
SLAC, Building 15 Upstairs Conference Room |
[ Review Committee Final Report |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/LCLS%20Review%20Committee%20Report%2020060330.doc ] |
March 30, 2006 |
[ Response to Final Report |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/Response%20to%20LCLS%20Review%20Committee%20Report%2020060330.doc ] |
April 17, 2006 |
Agenda |
Topic |
Presenter |
Start Time |
End Time |
[ Welcome, Overview and Committee Charter |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Introduction and Overview.ppt ] |
Chairman |
8:00 |
8:30 |
[ Power Supplies, Racks and Cables |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Bellomo Power Supply Talk.ppt ] |
Paul Bellomo - Controls and Power Electronics Department |
8:30 |
9:30 |
Break |
|
9:30 |
9:45 |
[ Intermediate Power Supply Controllers |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Ethernet Power Supply Controller.ppt ] |
Dave MacNair -Controls and Power Electronics Department |
9:45 |
10 45 |
Break |
|
10:45 |
11:00 |
[ MCOR Controls |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/lcls_mgnt_ps_fdr_mar30_2006.ppt ] |
Kristi Luchini - LCLS Controls Department, WBS Manager |
11:00 |
11:30 |
Lunch |
|
11:30 |
13:00 |
[ Sector 21 Quad Switchover |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/de Lira Sector 21 Switchover Talk.ppt ] |
Antonio de Lira - Controls and Power Electronics Department |
13:00 |
14:00 |
[ Hazard Analysis Summary |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/Hazard Analysis Summaries.ppt ] |
Paul Bellomo - Controls and Power Electronics Department |
14:00 |
14:30 |
[ Cost and Schedule |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/lcls_mgnt_inj_bc1_cost_and_schedule.ppt ] |
Kristi Luchini - LCLS Controls Department, WBS Manager |
14:30 |
15:00 |
Break |
|
15:00 |
15:15 |
Closeout |
Chairman |
15:15 |
16:15 |
Review Committee |
Marjorie Widmeyer |
SSRL Electronics Engineering |
Chair |
Glenn James |
Lawrence Livermore National Laboratory |
Dave Nelson |
SLAC PPA Electronics and Software Engineering |
Fernando Rafael |
SSRL Electronics Engineering |
Dan Shimer |
Lawrence Livermore National Laboratory (retired) |
Scribe |
Kristi Luchini and Paul Bellomo |
Charge to the Committee
The Committee will:
- Evaluate the presented designs against LCLS physics and performance requirements
- Determine if the degree of inter-discipline integration is adequate
- Ascertain if the system definitions support writing software operating programs
- Identify any other technical issues not already addressed in the presented designs.
- Determine if the presented plans for design, procurement, and installation are reasonable
- Identify any safety or environmental issues that require addressing
- Write a report of comments, findings, and recommendations
Handouts |
[ Injector Announcements and Agenda |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/InjectorAnnouncement and Agenda.doc ] |
[ List of Magnets and Power Supplies for First Commissioning |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/List of Magnets and Power Supplies for First Commissioning.xls ] |
[ VME I/O and Network Signal List |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/lcls_mgnt_inj_bc1_signal_list.xls ] |
Addendums |
Jul 16, 2007 |
K. Luchini |
[ Updated List of Magnets and Power Supplies for First Commissioning |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/List of Magnets and Power Supplies for First Commissioning_V4.xls ] |
Aug 8, 2006 |
K. Luchini |
[ Updated VME I/O and Network Signal List |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list_V5.xls ] |
June 14, 2006 |
K. Luchini |
[ Updated MCOR/EPSC Controls Presentation |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/mgnt/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_ps_fdr_mar30_2006_UPDATE.ppt ] |
June 8, 2006 |
K. Luchini |
Updatted VME,PLC I/O and Network Signal List [ (word) |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list_V2.doc ] [ (excel) |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list_V4.xls ] |
April 6, 2006 |
K. Luchini |
[ Updated VME I/O and Network Signal List |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector%20and%20BC1/lcls_mgnt_inj_bc1_signal_list.doc ] |
April 19, 2006 |
P. Bellomo |
[ Updated List of Magnets and Power Supplies for First Commissioning |
http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/magnet/presentations/FDR/hw/Injector and BC1/List of Magnets and Power Supplies for First Commissioning_V2.xls ] |