h1. Toroid Electronics Meeting Minutes
h1. August 23, 2006
h1. Analog Electronics Design
^
h2. Contents
{maketoc}^
h1. Attendees:
| John Dusatko  | Bob Simmmons | Michael Cecere |
| Steve Smith | Tim Montagne | |

h1. Agenda:
# Schematics ready for layout
# Next up: software development, CPLD code, hardware.

h1. Presentation Materials:
[PPT for meeting, August 23, 2006, M. Cecere|http://lcls-dev:4298/tiki-download_wiki_attachment.php?attId=56]

h1. Schematics, Netlist, and BOM for BCM:
[BCM Schematics, PDF, Aug 23, M. Cecere|http://lcls-dev:4298/tiki-download_wiki_attachment.php?attId=57]
[BCM Schematics BOM, EXCEL, Aug 23, M. Cecere|http://lcls-dev:4298/tiki-download_wiki_attachment.php?attId=59]
[BCM Schematics Netlist, PADSPCB, Aug 23, M. Cecere|http://lcls-dev:4298/tiki-download_wiki_attachment.php?attId=60]

h1. Minutes:
* Circuit Discussion
** Add header for access to Voffset cancellation circuitry
** Slow down op-amps affter Integrator? maybe after board made
** remove termination of EVR into CPLD, add some series resistance.
** same for 119MHz into CPLD
** check with Evgeny on EEIP issues for box layout
** consider adding pi filter network between AC/DC PS and PCB
** check PS current requirements
** drawing numbers on front of box...

* Toroid Manufacture Update (Tim Montagne)
** 3 braze failures so far
** will try new process, fire ceramic with no metal to create eutectic braze alloy
** expect to come out of furnace next monday
** will due pull-test to check durability, coat
*** if fails, assemble for a electrical/mechanical test and deliver to CPE
*** step back and do traditional metallization process


h1. Action Items:
# *M. Cecere:* Adjust circuit as described above and put on v: drive, pdf's
# *M. Cecere:* Deliver netlist to Tung
# *M. Cecere:* See Jennifer about parts procurement
# *M. Cecere:* Start Software Development!
# *M. Cecere:* Continue overseeing box and cable designs