Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Place detector behind gate valve, vent, remove liquid jet shroud.
  • Insert Ag behgenate, check out Wave 8 timing (no longer behind the shroud).
  • Kaz is able to verify Wave8 is timed in properly.
  • END DAY ONE.

 

Day two was mostly washed out by inability to run the detector due to DAQ config error.  Did verify timing delay or 231us.

 

Day 3:  Looking to generate enough flux per shot to trigger autorange in the JF.  Problem is that fluorescence foils burn through immediately and we see greatly reduced flux.  A script has been written to reposition the foil once per shot so that we're continuously using new foil.

 

  • Sample ladder has metallic glass, 25um Cu foils, and doubled Cu foil loaded.

 

Plan to go:

  • Force high gain mode
  • Collect 1000 darks for analysis (Conny test 1; pedestals, noise, bad pixel map)
  • Force medium gain
  • Collect 1k darks (C2, pedestals/offsets, noise, bad pixel map)
  • Force low gain
  • Collect 1k darks (C3, pedestals/offsets, noise, bad pixel map)

...