...
Table of Contents | ||
---|---|---|
|
beam Beam time scheduled for Run23
Labor Day weekend MFX
Plus a Science measurements measuremens at Rixs
Weekly_Thursday_Calibration_Meeting_Confluence_Page
Table 1. Beamtimes and what is intended to be evaluated.
Camera testing | Station Beam | Dates | Objective | Beamtime_Summary_Page (photos, scripts, and everyting...) | Run_summary |
ePixM | MFX (8.8 keV) | 15,16 April, 2024 | First ePixM beamtime, run the detector with different run/daq rates, CompTH_ePixM values, temps... | April_15th_first_Beamtime | Apr_15_16_2024.xlsx |
ePixM | MFX (11.05 keV) | 12 May, 2024 | Test the detector with soft X-ray fluorescence (Yttrium, Ag, Cu targets) . | ||
ePixM | MFX (11 keV) | 15 June, 2024 | Evaluate the crosstalk within ASIC and inter-ASICs with different masks, but the unit was died when replacing the mask. | June_15th_2024_Beamtime | June_15_2024.xlsx |
ePixM (RX003) | MFX (9.8 keV) | 1 Sep, 2024 | Evaluate the crosstalk within ASIC and inter-ASICs with a new unit. | ||
ePixM (RX003) | MFX (9.8 keV) | 1 Oct, 2024 | Evaluate new register setting optimised for dynamic range, new |
setup orientation, |
low temp... | |||||
ePixURH (41-C00-01) or (ePixM +ePix10k 2M) | MFX | 8, 11 Nov, 2024 | First ePixUHR beamtime, run the detector with different gain modes and see the photons |
ePixUHR Documents
ePixUHR 35kHz - Documentation (Lorenzo)
Running ePixUHR-35kHz (v2) with GT Readout Platform (Pietro)
Beamtime Prep for Run23
Calibration meeting notes 07/18/2024
Beamtime Measurement Plan
Measurements_Plan_Apr_22_2024.xlsx
...
some_proposed_epixm_tests_20_jun_2024.docx
Measurements_Plan_Sep_01_2024.xlsx (Final)
ePixM ASICs & Hardware Design
ePixM & ePixHRM (TID-IC Documentation)
...
ePixM carrier boards initial tests (Xavier)
ePixM daq integration Page (Created by
...
Analysis topics:
- some high level summary/update of where we are on this issue?
...