Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Full recovery, from e.g. a CPU reboot or power outage

  1. Master Check that CPU is up, verify master source IOCs sioc-sys0-ms0[1..6] should be are running
    1. See Troubleshooting
  2. Open the MS/PRL main display
    1. See Displays
  3. Ensure Verify that the MO is locked
    1. See MOLocker
  4. Ensure Verify that all power amps are at their target power levels
    1. Digital attenuators should be at their target attenuation
    2. All PVs should be in NO_ALARM state (no red alarms on any PVs)
    3. See PRLAmps
    4. Note: If chassis have been power cycled, there may be a discrepancy between the amp power and the attenuator setpoint.  See Troubleshooting.
  5. Verify Ensure that PRL loops are locked
    1. ...See PRLLoops