Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

List of Travelers:

NumberTitle and LinkAuthorDate Modified
DOC
ATLAS CO2-
10000
100ATLAS CO2
Plant
-100 High Pressure Decay Test.docxBrian Qiu8 July 2020
DOC
ATLAS CO2-
10001
101ATLAS CO2
Plant
-101 Evacuation and CO2 Filling Procedure.docxBrian Qiu3 June 2020
DOC
ATLAS CO2-
10002
102 ATLAS CO2
Plant
-
Operation
102 operation of the Julabo chiller .docxBrian Qiu8 July 2020
DOC
ATLAS CO2-
10003
103ATLAS CO2
Plant
-103 Startup and Shut Down of the CO2 Plant 7-9.docxBrian Qiu9 July 2020
DOC
ATLAS CO2-
XXXX
104
- Operation of Sensors (Temperature, Pressure)
Brian Qiu18 Nov 2021
Scott Newbry 
DOC-
XXXXQC Test Box - Operation of the IR Camera
10004Scott Newbry
 
29 March 2021
DOC-
XXXX
10005
Test
Operation
and
Scott Newbry
 

29 March 2021

DOC-

XXXX

10004

additional

Doc 10004 Common

QC Test Box -

Operation of the

XY StagesScott Newbry DOC-XXXXOverall Procedure for 19-0 Prototype Thermal TestScott Newbry 

Notes:

DateNotesAuthorDescription
10 July 2020CO2 Plant Operation Notes 10 July 2020.pptxScott NewbryCool-down of CO2 plant with 19-0 Ring and IR Camera
    
    

Hitachi VFD

Brian Qiu21 Sep 2021

Notes:

See Thermal Tests (confluence page) for links and information on the studies done so far at SLAC for Thermal Testing (and related instrumentation).

Manual for VFD:  https://www.hitachi.us/supportingdocs/forbus/inverters/Support/WJ200_Instruction_NT325X.pdf

CO2 Operation harzard table is here

The spreadsheet for operating CO2 system is here

===========================================================================================================================================================

QC Test Box XY Stages

Contact: Sanha Cheong (sanha@slac.stanford.edu)


DCS & Monitoring

Contact: Valentina Cairo (vcairo@slac.stanford.edu) & Matthias Wittgen (wittgen@slac.stanford.edu)