List of Travelers:

NumberTitle and LinkAuthorDate Modified
ATLAS CO2-100ATLAS CO2-100 High Pressure Decay Test.docxBrian Qiu8 July 2020
ATLAS CO2-101ATLAS CO2-101 Evacuation and CO2 Filling Procedure.docxBrian Qiu3 June 2020
ATLAS CO2-102 ATLAS CO2-102 operation of the Julabo chiller .docxBrian Qiu8 July 2020
ATLAS CO2-103ATLAS CO2-103 Startup and Shut Down of the CO2 Plant 7-9.docxBrian Qiu9 July 2020
ATLAS CO2-104Brian Qiu18 Nov 2021
DOC-10004Scott Newbry29 March 2021
DOC-10005Scott Newbry

29 March 2021

DOC-10004

additional

Doc 10004 Common Operation of the Hitachi VFD

Brian Qiu21 Sep 2021

Notes:

See Thermal Tests (confluence page) for links and information on the studies done so far at SLAC for Thermal Testing (and related instrumentation).

Manual for VFD:  https://www.hitachi.us/supportingdocs/forbus/inverters/Support/WJ200_Instruction_NT325X.pdf

CO2 Operation harzard table is here

The spreadsheet for operating CO2 system is here

===========================================================================================================================================================

QC Test Box XY Stages

Contact: Sanha Cheong (sanha@slac.stanford.edu)


DCS & Monitoring

Contact: Valentina Cairo (vcairo@slac.stanford.edu) & Matthias Wittgen (wittgen@slac.stanford.edu)