List of Travelers:
Number | Title and Link | Author | Date Modified |
---|
DOC10000 Plant DOC10001 Plant DOC10002 Plant Operation DOC10003 Plant XXXXQC Test Box - Operation of the IR Camera XXXX Test Operation and XXXXOverall Procedure for 19-0 Prototype Thermal Test | Scott Newbry | | Notes:
Notes:
See Thermal Tests (confluence page) for links and information on the studies done so far at SLAC for Thermal Testing (and related instrumentation).
CO2 Operation harzard table is here
The spreadsheet for operating CO2 system is here
===========================================================================================================================================================
Contact: Sanha Cheong (sanha@slac.stanford.edu)
Contact: Valentina Cairo (vcairo@slac.stanford.edu) & Matthias Wittgen (wittgen@slac.stanford.edu)