See Thermal Tests (confluence page) for links and information on the studies done so far at SLAC for Thermal Testing (and related instrumentation).

Manual for VFD:  https://www.hitachi.us/supportingdocs/forbus/inverters/Support/WJ200_Instruction_NT325X.pdf

CO2 Operation harzard table is here

The spreadsheet for operating CO2 system is here

===========================================================================================================================================================

QC Test Box XY Stages

16:14 PM May 21, 2021: UNDER DEVELOPMENT

This documents the set-up and the operation of the XY stages (one for the ring and the other for the stave) in the QC test box.

ContactsContact: Sanha Cheong (sanha@slac.stanford.edu), Zhi Zheng (zzheng@slac


DCS & Monitoring

Contact: Valentina Cairo (vcairo@slac.stanford.edu)

Set-up Overview

The stages are powered OpenBuilds 24V DC power supplies inside the QC test box. They are also connected via USB to the iMac (running Ubuntu) next to the QC text box and can be controlled by `OpenBuilds CONTROL` software.

Operation & Calibration Procedures

Ring Stage

USB0, Left PS

X: + is down, - is up. steps / mm = 197.04

Y: + is in, - is out. steps / mm = 57.14

Interlocks: X = [-5.21mm, 263mm] Y = [-5.18mm, 410mm]& Matthias Wittgen (wittgen@slac.stanford.edu)