List of Travelers:

NumberTitle and LinkAuthorDate Modified
DOC
ATLAS CO2-
10000
100ATLAS CO2-100 High Pressure Decay Test.docxBrian Qiu8 July 2020
DOC
ATLAS CO2-
10001
101ATLAS CO2-101 Evacuation and CO2 Filling Procedure.docxBrian Qiu3 June 2020
DOC
ATLAS CO2-
10002
102 ATLAS CO2-102 operation
Operation
of the Julabo chiller .docxBrian Qiu8 July 2020
DOC
ATLAS CO2-
10003
103ATLAS CO2-103 Startup and Shut Down of the CO2 Plant 7-9.docxBrian Qiu9 July 2020

Notes:

DateNotes
8 July 2020Chiller Operation .pptx
  
  

Notes:

See Thermal Tests (confluence page) for links and information on the studies done so far at SLAC for Thermal Testing (and related instrumentation).

Manual for VFD:  https://www.hitachi.us/supportingdocs/forbus/inverters/Support/WJ200_Instruction_NT325X.pdf

CO2 Operation harzard table is here

The spreadsheet for operating CO2 system is here

===========================================================================================================================================================

QC Test Box XY Stages

Contact: Sanha Cheong (sanha@slac.stanford.edu)


DCS & Monitoring

Contact: Valentina Cairo (vcairo@slac.stanford.edu) & Matthias Wittgen (wittgen@slac.stanford.edu)