Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

 Photons program

swing16 + owl17 + day17  

 part

 E

table position

BT

 trigger

AD sync

 beam energy

CU position and impact point

CU configuration 

tagged

statistics 

 magnet

estimated time (hrs) 

note 

purpose 

 2.5  

 BT1

 no (full-brem)

2M

5 (overnight)

PSF for flight tower

 2.5

  0 degrees through twr3

  BT1 

 yes

100K

 2.5

 PSF+Erecon for flight tower

 1.5

"

 "

 yes

100k

 2.5

 "

 1

"

 "

 yes

100K

 2.5

 "

 0.5

"

 "

 yes

150k 

 4

 "

 2.5

"

 

 no (full-brem)

 

 

 

 2.5

 30 degrees impact twr3 through twr2

 "

 yes

100k

 2.5

 PSF+Erecon tower dependence

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 pedestal run for tagger

 

 

 

 

 

 

 

 

 

 

 move CU to center of twr 3 (see below)

 e

2.5

  0 degrees through twr3 (x=607,y=45,z=0,angle=0)

 BT1

 S0&S2&C1&C2&NoSh&NoS3

  yes

 10K

 0

 -

 check position of beam wrt CU


 e

 2.5

 "

 BT1

   S0&S2&C1&C2&NoSh&NoS3

 NO

 100k

 0

-

   measure beam properties

 

 e

 2.5

"

  BT1 

 S0&S2&S4&C1&C2&NoSh&NoS3

 yes

100K

 600A

 2.5

set slits at 51.5 - check that rate on S0 is 5K part/spill
take 25k runs

 PSF+Erecon for flight tower

 e

 1.5

"

 "

  S0&S2&S4&C1&C2&NoSh&NoS3

 yes

100k

 360A

 2.5

 "

 "

 e

 1

"

 "

  " S0&S2&S4&C1&C2&NoSh&NoS3

 yes

100K

 240A  100k

 2.5

 "

 "

 e

 0.5

"

 "

  " S0&S2&S4&C1&C2&NoSh&NoS3

 yes

200k 

 150k  120A

 4

 "  1

20 degrees, impact on twr3 through twr2, impact point 1

 "

yes  e

100k

2  2.5

Erecon

 1

20 degrees, impact on twr3 through twr2, impact point 2

 "

 yes

100k

2.5

 "

"

 

  S0&S2&C1&C2&NoSh&NoS3

 no (full-brem)

 2M

 600A

 5

take 100k runs.
start no later than 3AM, if necessary postpone previous runs to the next day. If finished before 8AM just proceed and take data until 8AM

 0.5

tagger calibration for 100mev gammas

 

 

 

 8

move tagger, improve resolution for 500mev primary beam

 

 

 

 

 0.5

0 degrees through twr3

 

 

 150K  

 5

PSF+Erecon for flight tower for 100mev well-tagged gammas

 

 

 

 

 0.5

30 degrees impact twr3 through twr2

 

 

 150K  

5

PSF+Erecon for flight tower for 100mev well-tagged gammas

 

 

 

 

 0.5

20 degrees, impact on twr3 through twr2, impact point 1

 

 

 150K

 5

PSF+Erecon for flight tower for 100mev well-tagged gammas