Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

This test is composed of 4 steps:

  1. Generate eye diagram (error scan) for each lane
  2. Check charge injection
  3. Check laser
  4. Check BIAS as low as -50V

...