30 min | Status | All | - Group priorities review:
- Detectors for Run 18
- Jungfrau commissioning plan and commissioning tests (Comments on plan? Determine flux))
- ePix10k2M (new) Final tests before deployment, commissioning test plan commissioning/calibration along same lines as JF.
- ePix10k2M (old) Needs shroud re-replaced, plans for backplate replacement.
- ePix smalls tests to match.
- Meet w/Mason re chiller troubleshooting Wed. 1pm
- Detectors under development
- RIXS-CCD, review draft Project Plan w/NEH 2.2
- RIXS-CCD Concept Design (R to set meeting to talk cooling options)
- Anton project at UCB/SSL (milestone/schedule revision received)
- SXR Downselect prep
- Lab 'commissioning'
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- Laser table re-cert
- BIO for racks in chase
- DP node purchase
- Sealed source purchase (M&S evaporating)
Actions: - check with TID about status of small epix100/10ka. (Mark, query sent)
- check what cables we need for the in-vac epix100 setup in MEC and CXI. (Philip)
- Leak check Kimball rig (1e-8 on Thu, probably good for next steps)
- Laser recertification (Kaz)
- Wave8-V2 tests (Kaz)
- RIXS system pumpdown and noise vs. temp (3e-7 on Thur, ready for next steps)
- Philip may be hearing from ALS regarding JF, PD may want to make use of PQ laser.
Other news: ePix10k2M calibration/communication progress continues, escalation necessary?
CH: USB patch cord available?? - Fluorescence calculations to help with??
RA: Beam pipes for 2M? No. - Loan stages to CXI....ensure return.
- Meet re cooling concepts...met with Jim re outside space: not much.
KP: JSA summary list circulated - Small Rayonix to be tested in XPP...manual available??
|