Purpose | preferred schedule | Ion | Energy | Rate on CU | Beam focus | Trigger | Runs* | notes | preliminary analysis | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Test multiple trigger engines prior to beam | nov 17 | NA | NA | NA | NA | all BTs |
| change CNO thresholds, periodic frequency | |||||||||||
Monitor beam rate and conditions | nov 18, 8-10 | C | 1.5Gev/n | 50-500Hz | play with focus to change beam intensityon CU | BT53 | 2519-2522 | spill is 6s long. monitor shows counts vary between 50-500Hz. | |||||||||||
0 degree configuration | nov 18 11-16 | C | 1.5Gev/n | 10 100-100Hz-1KHz 200Hz | nominal | BT50, BT51, BT54 | 2527-2534 | 250Kevts at ~200Hz | CAL studies: | Tracker saturation | nov 18 16-18 | C | 1.5Gev/n | 10-1KHz | nominal + focus on CU | BT3 |
| take runs with TKR trigger only vs beam rate (10-100-1K) |
|
30 degree | nov 18 20-21 | C | 1.5GeV/n | 100Hz 260Hz | nominal | BT50 | 2535-2537 for beam tuning | move CU at 30 degrees, take some events to check ACD CNO threshold for new hit tiles |
| ||||||||||
30 degree configuration | nov 18 21 - nov 19 2 | C | 1.5GeV/n | 100Hz | nominal | BT50, BT51, BT54 |
| per BT type collect: |
| ||||||||||
60 degree configuration Tracker performance | nov 19 2-7 | C | 1.5GeV/n | 100Hz | nominal | BT50, BT51, BT54 |
| per BT type collect: |
| ||||||||||
0 angle, twr 3 (no ACD tile) | nov 19 7-12 | C | 1.5GeV/n | 100Hz | nominal | BT50, BT51, BT54 |
| per BT type collect: |
| ||||||||||
charge injection with beam | nov 19 12-13 | C | 1.5GeV/n | 100Hz | nominal | CalibGen, |
| keep beeam on |
| ||||||||||
Energy scan | nov 19 | C,Xe | 600MeV/n - 1.5GeV/n in steps | 10-1000Hz | far and near focus | BT51 |
| attempt to simulate different ions by varying ionization energy | fabio | ||||||||||
Secondary ions with target | nov 19 | Xe | 1.5GeV/n | 10-1000Hz | far and near focus | BT50 |
| attempt to get different ions by shooting beam through a target - need verification with GSI people | benoit | ||||||||||
scintillation measurement in CDE | nov 19 | Xe | 1.5GeV/n | 100Hz |
| NA |
| place another detector upstream and monitor signal pulse - move measurement before switching to Xe if C is wanted | benoit |