Program
Postponed from for day shift 9/8 to 1011/8 swing because of non availability of beam on 9/8 and 10/8
particle | energy | trigger | events | purpose | mode | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
e | 2.5 | S0+S2+NOSh+C1+C2 | 10K | check beam position after restart | same CU configuration, change trigger, sync with AD | ||||||
None | none |
|
| pedestal run for CAL | CU BT22 | ||||||
e | 2.5 | S0+S2+NOSh+C1+C2 | 100K | e calibration | same CU configuration, magnet off, e trigger, NO AD | ||||||
e | 1 | S0+S2+NOSh+C1+C2 | 100K | 1GeV e in the CU for calibration | magnet off; check position of beam wrt to dump | ||||||
e | 0.5 | S0+S2+NOSh+C1+C2 | 10K | 0.5 GeV e in the CU for calibration | magnet off; check position of beam wrt to dump | ||||||
e | 1 | S2+S4+NOSh+C1+C2 | 100K | 1 GeV photon tagged | magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each | e | 1 | S2+S4+NOShNOS3+C1+C2 | 100K | 1 GeV photon tagged - CU position 2 (TBD) | magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each |
e | 1 | S2+NOSh+C1+C2+Sback | 10K | test to redefine full-brem photon trigger to maximize efficiency | add Sback after tagger and in trigger, take data with no AD | e | 1 | S2+NOSh+C1+C2 | 10k | test to get full-brem+AD | read sync AD but full-brem trigger; test data readout rate and synchronization |
e | 1 | S0+S2+NOSh+C1+C2 | 100K | 1GeV e in the CU for calibration | magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each | ||||||
e | 2.5 | S0+S2+NOSh+C1+C2 | 10K | check beam position after changing energy | magnet off, sync with AD | ||||||
e | 2.5 | S0+S2+NOSh+C1+C2(Sback?) | 2M | full brem at 2.5GeV - configuration 2 | NON synchronized with AD; scan the next position of the CU (TBD) | ||||||
|
|
|
|
| |