T9/PS run Daily Briefings

...

- 3PM

 

 Date

Room

 Communications

Online report

Offline report

Run program

Notes

 july 28

13-3-005

- Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient;  fan added to cool XY table motors. Please look at the temperature during your shift

 - DAQ sync studies going on
- CU: Ric investigating phasing errors 

 Francesco:
- pipeline  nicely running
- 1st 1000 evetns in SVAC ntuple duplicated  
Claudia: 
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)

Wiki Markup
\- MC and CU cooprdinate systems mismatch (check with Philippe) 
Dave:
\- no CAL-HI triggers in last night data as  fhe values were saturated
\\
 \|  \- Complete DAQ sync studies
\\
 \- perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay)
\- explore beam conditions 
\- ACD calibrations (ideally 5gev p, if NA 5gev e) 
\- CAL runs with e (Benoit)
\- Tagger calibration start on 29 morning  \|  \- Fill elogbook
\- Take your shifts and launch runs yourself 
\- rcReport has wrong table positions for runs \[701-736\]; the right correlation table between position and run will be circulated. Please +reset+ runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf)  \|
 

 

July 26 - room 13-2-005
10:30 : Safety visit from CERN: minor action items being followed by Luca L.

July 27 - room 13-3-005

Program  

July 28 - room 13-3-005

 

 

 Communications

 - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient;  fan added to cool XY table motors. Please look at the temperature during your shift

 Online Report

 - DAQ sync studies going on
- CU: Ric investigating phasing errors

 Offline Report

 Francesco:
- pipeline  nicely running
- 1st 1000 evetns in SVAC ntuple duplicated  
Claudia: 
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)
- MC and CU cooprdinate systems mismatch (check with Philippe) 
Dave:
- no CAL-HI triggers in last night data as  fhe values were saturated

 Program

 - Complete DAQ sync studies
- perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay)
- explore beam conditions 
- ACD calibrations (ideally 5gev p, if NA 5gev e) 
- CAL runs with e (Benoit)
- Tagger calibration start on 29 morning

Notes 

 - Fill elogbook
- Take your shifts and launch runs yourself 
<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="69dbd8ccb29a5165-504a9855-48a94bd9-b903be06-6a3791247c0a1a11b5f0c38d"><ac:plain-text-body><![CDATA[ - rcReport has wrong table positions for runs [701-736]; the right correlation table between position and run will be circulated. Please reset runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf)

]]></ac:plain-text-body></ac:structured-macro>

...

July 29 - room 32-1-A24

Program

...