During the week of May 7 to 11, 2007 there was a meeting at SLAC to plan the next round of work on tracking simualtions and reconstruction for the SiD detector. These pages show the material presented and summarize the discussions.
Confluence will be down Monday 6AM PT to 7AM PT. We will be adding new login options.
During the week of May 7 to 11, 2007 there was a meeting at SLAC to plan the next round of work on tracking simualtions and reconstruction for the SiD detector. These pages show the material presented and summarize the discussions.