During the week of May 7 to 11, 2007 there was a meeting at SLAC to plan the next round of work on tracking simualtions and reconstruction for the SiD detector. These pages show the material presented and summarize the discussions.
During the week of May 7 to 11, 2007 there was a meeting at SLAC to plan the next round of work on tracking simualtions and reconstruction for the SiD detector. These pages show the material presented and summarize the discussions.