Date

Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
10 minBeamtime support update
  • Updates since Monday?
  • Baseline JF and 2M 'traveller' pages on Confluence.
    • Collect and analyze any remaining in-lab test data.
30 minPriorities ReviewAll
  • Group priorities review:
    • In-House proposal writing (due 11/6):
      • Hi-Z
      • ePixHR
      • tixel
      • UXI
      • HEXITEC (MHz?)
    • Testing
      • Setup ePix10k, ePix100, JF smalls for test in lab
      • Characterize: Noise vs. temp, response vs. bias, stitching in transition regions,
        charge injection, timing window vs noise, bad pixel maps, constants
      • UED testing
      • RIXS-CCD cooler
      • RIXS-CCD noise vs. temp
    • Analysis
      • Gather and process relevant commissioning data for Mp travellers on Confluence.
          • Solid pedestals
          • Noise map
          • Response uniformity (mini-X cu-fluorescence)
          • Bootstrap gain (sealed source)
          • Linearity (signal injection)
    • Documentation
      • Complete on-line travellers for Mp detectors

    • Development
      • RIXS-CCD, review draft Project Plan w/NEH 2.2
      • RIXS-CCD Concept Design quote in hand ($58k)
      • Anton project at UCB/SSL underway, biweekly meetings
      • SXR Downselect prep (Peter says 2/1, checking w/TID)

    • Lab 'commissioning'
      • DAQ
        • Storage nodes
        • LCLS I/II compatibility
      • Table seismic
      • BIO for racks in chase
      • DP node purchase


Actions:


30 minStatus

In-person tags in 1050??


CH: (Are we ready to fix dashed line issue in the hutches?)

  • Attending conference this week, Hi_Z meeting tmrw.


RA: (Are we on track for Lin tests, and when to schedule him?)

  • Loan stages to CXI....ensure return.
  • Meet re cooling concepts...met with Jim re outside space: not much.


KP: JSA summary list circulated

  • XPP/MFX/XCS fibers due this week, other wise need ugly solution.
  • Small Rayonix testing can be done by others.
  • XPP/XCS power cable pinout (controls needs to tell us MPOD working)


KN:

  • UED Quad now running on our DAQ (LCLS-II)...no 2m when quad testing going on due to PDU channel limit.
  • Replace PDU and cable in XPP to address 10A draw on Pix100
  • XCS IOC: Immediately trips when IOC is running, suspect software problem but not fully isolated.

PH:

  • ePix100 readout issues persist....how do we isolate?  Wait until after vac break.
  • UXI IoC update
  • MEC Laser-only tests
  • w? Bhavna & Frederic regarding commissioning data
  • Learning NERSC interface
5 minBudget Updatemmck
  • M&S Status (Through July)



  • Labor snapshot (June actuals):


15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business

Action items: