Time | Item | Who | Notes |
---|
10 min | Beamtime support update |
| - Baseline JF and 2M 'traveller' pages on Confluence.
- Collect and analyze any remaining in-lab test data.
|
30 min | Priorities Review | All | - Group priorities review:
- In-House proposal writing (due 11/6):
- Hi-Z
- ePixHR
- tixel
- UXI
- HEXITEC (MHz?)
- Testing
- Setup ePix10k, ePix100, JF smalls for test in lab
- Characterize: Noise vs. temp, response vs. bias, stitching in transition regions,
charge injection, timing window vs noise, bad pixel maps, constants - UED testing
- RIXS-CCD cooler
- RIXS-CCD noise vs. temp
- Analysis
- Gather and process relevant commissioning data for Mp travellers on Confluence.
- Solid pedestals
- Noise map
- Response uniformity (mini-X cu-fluorescence)
- Bootstrap gain (sealed source)
- Linearity (signal injection)
- Documentation
- Complete on-line travellers for Mp detectors
- Development
- RIXS-CCD, review draft Project Plan w/NEH 2.2
- RIXS-CCD Concept Design quote in hand ($58k)
- Anton project at UCB/SSL underway, biweekly meetings
- SXR Downselect prep (Peter says 2/1, checking w/TID)
- Lab 'commissioning'
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- BIO for racks in chase
- DP node purchase
Actions:
|
30 min | Status |
| In-person tags in 1050??
CH: (Are we ready to fix dashed line issue in the hutches?) - Attending conference this week, Hi_Z meeting tmrw.
RA: (Are we on track for Lin tests, and when to schedule him?) - Loan stages to CXI....ensure return.
- Meet re cooling concepts...met with Jim re outside space: not much.
KP: JSA summary list circulated - XPP/MFX/XCS fibers due this week, other wise need ugly solution.
- Small Rayonix testing can be done by others.
- XPP/XCS power cable pinout (controls needs to tell us MPOD working)
KN: - UED Quad now running on our DAQ (LCLS-II)...no 2m when quad testing going on due to PDU channel limit.
- Replace PDU and cable in XPP to address 10A draw on Pix100
- XCS IOC: Immediately trips when IOC is running, suspect software problem but not fully isolated.
PH: - ePix100 readout issues persist....how do we isolate? Wait until after vac break.
- UXI IoC update
- MEC Laser-only tests
- w? Bhavna & Frederic regarding commissioning data
- Learning NERSC interface
|
5 min | Budget Update | mmck | - M&S Status (Through July)
- Labor snapshot (June actuals):
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business |
|
|