Time | Item | Who | Notes |
---|
20 min | Deployment 3-wk plan | Team | Shift coverage this week. - Th 0900: LV37 (Song), @XCS, on-call??
- ongoing: LV25 (Nagler) @MEC ??
- Others??
|
10 min | Other beamtime-related |
| - Wave8 testing/status?
- ePix10k
- DAQ/IOC saga update?
- Small 10k testing?
- Baseline JF and 2M 'traveller' pages on Confluence.
- Collect and analyze any remaining in-lab test data.
|
30 min | Priorities | All | - Group priorities review:
- Testing
- Setup ePix10k, ePix100, JF smalls for test in lab
- UED testing
- Baseline tests on smalls pre-deployment.
- Parametric performance tests (10k first)
- Analysis
- Gather and process relevant commissioning data for Mp travellers on Confluence.
- Solid pedestals
- Noise map
- Response uniformity (mini-X cu-fluorescencce)
- Bootstrap gain (sealed source)
- Linearity (signal injection)
- Documentation
- Complete on-line travellers for Mp detectors
- Development
- RIXS-CCD, review draft Project Plan w/NEH 2.2
- RIXS-CCD Concept Design (R to set meeting to talk cooling options)
- Anton project at UCB/SSL (milestone/schedule revision received)
- SXR Downselect prep
- Lab 'commissioning'
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- BIO for racks in chase
- DP node purchase
Actions:
|
30 min | Status |
| CH: (Are we ready to fix dashed line issue in the hutches?) - Charge injection scripts on 10k smalls for mask tests.
RA: (Are we on trac for Lin tests, and when to schedule him?) - Loan stages to CXI....ensure return.
- Meet re cooling concepts...met with Jim re outside space: not much.
KP: JSA summary list circulated - XPP/MFX/XCS fibers due this week, other wise need ugly solution.
- Small Rayonix testing can be done by others.
- XPP/XCS power cable pinout (controls needs to tell us MPOD working)
KN: - UED Quad now running on our DAQ (LCLS-II)...no 2m when quad testing going on due to PDU channel limit.
- Replace PDU and cable in XPP to address 10A draw on Pix100
- XCS IOC: Immediately trips when IOC is running, suspect software problem but not fully isolated.
PH: |
5 min | Budget Update | mmck | - M&S Status (Through July)
- Labor snapshot (June actuals):
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business |
|
|