  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minDeployment 3-wk planTeam

Shift coverage this week.

  • M, T, W: P173 @CXI (oncall)
  • Th: X420 @CXI (JF?), X421@XPP (ePix100) (oncall?) X396@XCS (TVD, ePix10k2M check constants)

  • Other:
  • Wave8 status?
  • ePix10k Constants status/plan?
  • Rayonix on track for need dadte?
  • Baseline JF and 2M 'traveller' pages on Confluence.
    • Collect and analyze any remaining in-lab test data.
      • Solid pedestals
      • Noise map
      • Response uniformity (mini-X)
      • Bootstrap gain (sealed source)
      • Linearity (signal injection)
      • Document results in 'traveller' on confluence
    • Next detector deployed: Kayla to lead meeting for mapping detectors to experiments.
30 minStatusAll
  • Group priorities review:
    • Detectors for Run 18
      • Jungfrau commissioning plan and commissioning tests.
      • ePix10k2M (new) Commissioning test plan, calibration along same lines as JF.
      • ePix10k2M (old) Needs shroud re-replaced, plans for backplate replacement.
      • ePix smalls tests to match.
      • Detailed calibration on ePix/Jungfrau smalls

    • Detectors under development
      • RIXS-CCD, review draft Project Plan w/NEH 2.2
      • RIXS-CCD Concept Design (R to set meeting to talk cooling options)
      • Anton project at UCB/SSL (milestone/schedule revision received)
      • SXR Downselect prep

    • Lab 'commissioning'
      • DAQ
        • Storage nodes
        • LCLS I/II compatibility
      • Table seismic
      • Laser table re-cert
      • BIO for racks in chase
      • DP node purchase
      • Sealed source purchase (M&S evaporating)


Actions:


Other news:

KZ: Epix 100 now working in XPP...what is distance between kapton and sensor surface?

 

CH: USB patch cord available??

  • Mask measurements last week.
  • Project management training.
  • Charge injection scripts on 10k smalls for mask tests.

 

RA: Beam pipes for 2M? In work.

  • Loan stages to CXI....ensure return.
  • Meet re cooling concepts...met with Jim re outside space: not much.

 

KP: JSA summary list circulated

  • Small Rayonix to be tested in XPP...manual available??
  • XPP/MFX/XCS fibers due this week, other wise need ugly solution.
  • Small Rayonix testing can be done by others.
  • XPP/XCS power cable pinout (controls needs to tell us MPOD working)

 

PH:

  • Learning NERSC interface

 

 

 

 

5 minBudget Updatemmck
  • M&S Status (Through July)



  • Labor snapshot (June actuals):


15 minReview ASC First Projectsall

Coordinate/update lab schedule.