LCLS Estimated IOC Count for Injector and BC1

Table 1.1 lists the minimum number of VME CPU's that will be needed for system test May 21, 2006.

Table: 1.1

Area: Injector and BC1

Date Needed: May 21, 2006

Subsystem

Assigned To

MVME6100

MVME5500

BPMs

T. Straumann

?

?

Collimators

S. Peng

?

?

Fast Feedback

D. Fairley

?

?

Laser Steering

S. Peng

7

1

LLRF

D. Kotturi

0

0

Magnets

K. Luchini

0

1

MPS I

S. Norum

?

?

MPS II

A. Alarcon

1

0

PPS

Alarcon

1

0

BCS

Alarcon

3

0

Timing

D. Kotturi

2

0

Toroids

S.Peng

1

0

OTR/YAG

S. Peng

9

0

Wire Scanners

D. Murray

2

0

Vacuum

S. Schuh

?

?

Table 1.2 lists the number of VME CPU's in-house as of March 9, 2006.

Table: 1.2

SLAC PO: [ 54842

https://www-bis.slac.stanford.edu/slaconly/bin/purdetail.asp?ISREQ=yes&ID=0000115984 ] [ 58362

https://www-bis.slac.stanford.edu/slaconly/bin/purdetail.asp?isreq=yes&id=119773 ][ 57669

https://www-bis.slac.stanford.edu/slaconly/bin/purdetail.asp?isreq=yes&id=118962 ]

Model

Qty

MVME6100

11

MVME5500

9

Synergy PPC

??