here are plots produce for LAC calibration


LEX8 ADC signal, fitted by y= p2/(x+p3)/(exp((p0-x)/p1))
I am currently trying with y= (p2/(x+p3)/(exp((p0-x)/p1)))**2

Pedestal histogram fitted by a Gaussian

  • No labels