- NRL - Status (Zach, Sasha)
- Zach
- LPA based threshold calibration code complete.
- still need a little testing, CCB process
- Next task is update Integral Nonlinearity calibration code to match current LCI script to be used in flight
- relatively minor updates required.
- After that onto GCR calibration and simulation.
- LPA based threshold calibration code complete.
- Zach
- LPTA
- Including all filters in GCRcalib (pdf)
- SLAC - Status