Time | Item | Who | Notes |
---|
10 min | Beamtime support update |
| - No JSA needed for Office work, welcome to come on site as comfortable, pls coordinate if you occupy shared office, cubicles etc.
- Run 18 lessons learnedPlease use next instrument/dept meeting to have a lessons learned discussion with staff, take notes, send to me
- What worked well?
- What we can do better?
- What is the recurring issues needing attention?
- What is most needed to make your job easier?
- What do you wish people would know that would make your work smoother?
- What do you wish you knew that would make your work smoother?
|
30 min | Priorities Review | All | - 2021 events:
- Projects new starts:
- VFCCD/ePixM downselect → implementation of REXS for 2.2 - April 28-30
- SparkPix-S Phase II (full-size ASIC for sparsification, Tixel-based, underway)
- ePixHR IV: Prototype detector project underway
- TXI Detectors (2Mp and 140kp based on ePixHR @5kHz) CDR Closed out, project underway.
- ePixUHR (130nm TSV structure to reach 100kHz), planning
- Production:
- spare modules (0.5 & 1mm) Module order in work, new sensor order out
- Approved 3d copy of ePix10k2m: underway, November delivery
- Approved spare quads for MEC: underway, August delivery
- Proposed in-vac ePix10k2m for CXI: Deferred in favor of in-air 2m/1mm
- Proposed ePix10k4m (concept)
- Proposed UED detector upgrade (2kHz, 125um sensor, concept)
- RIXS-CCD/cooler test and verification: Second cooler rec'd, ship to STA??
- HiZ collaboration tests: SSRL LoI needed, Ge chamber tests
- Outreach for R&D support (SparkPix-ED, SparkPix Delta).
- Support effort for LCLS-II-HE instruments (performance verification/implementation planning)
- SBIR effort for UXI.
- Group priorities review:
- Testing
- explore CompEn bit function on 10k
- Setup ePix10k, ePix100, JF smalls for test in lab, Bhavna/Chris hands-on trng. Days this week?
- Review with TID the stitching progress, look for improvements. Latest on switching noise?
- Can we figure out what's wrong with ePix100/7?
- RIXS-CCD cooler test planning.
- Analysis
- Gather and process relevant commissioning data for Mp travellers on Confluence.
- Solid pedestals
- Noise map
- Response uniformity (mini-X cu-fluorescence)
- Bootstrap gain (sealed source)
- Linearity (signal injection)
- Documentation
- Complete on-line travellers for Mp detectors
- Development
- Lab 'commissioning'
- DAQ
- Storage nodes configured, put in use?
- LCLS I/II compatibility?
- BIO for racks in chase: anchoring status?
- Vac chamber for in-lab tests? Compatible with XPP alcove?
Actions:
|
30 min | Status |
| LDAC Panel assembled (waiting on Kuster)
CH: - TXI mtg help.
- IFDEPS?
- pyROOT for per-pixel spectra
- Synchrotron NoI?
- Ge config?
RA: - Meeting w/PD tmrw, camera.
- Need bake-out variac for lab.
KN: - Rayonix still cranky trigger, may be DAQ-related
- Spare JF Power supply received, need cold plate.
- UED MPOD?
- Rayonix has two bad tiles, too close to experiment to fix.
PH: - MFX 10k calibration with hockey stick has been refined slightly..2% of pixels have noisy first switch, need more uptime to test.
- UXI IoC update, need help from Dan to run in the lab.
BN: - Made updates to detector website, in work.
- working with PH on porting PyRoot to Python.
CK: - Ge chamber assembly
- Order variac
- New pin-out probes
- XPP having trouble with pgp server hat runs 2M.
- CXI fiber 450uW becomes 50-60uW, defect in port feedthrough sometime limits to 2uW(?), replacement flanges on order (8-9 weeks).
|
5 min | Budget Update | mmck | - M&S Status (Through March)
- Labor snapshot (December actuals):
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business |
|
|