Date
Attendees
Goals
- Set and status planning activities for detector development and deployment.
Discussion items
Time | Item | Who | Notes |
---|
30 min | Deployment 3-wk plan | Team | Shift coverage this week. - M, T, W: P173 @CXI (oncall)
- Th: X420 @CXI (JF?), X421@XPP (ePix100) (oncall?) X396@XCS (TVD, ePix10k2M check constants)
- Other:
- Wave8 status?
- ePix10k Constants status/plan?
- Rayonix on track for need dadte?
- Baseline JF and 2M 'traveller' pages on Confluence.
- Collect and analyze any remaining in-lab test data.
- Solid pedestals
- Noise map
- Response uniformity (mini-X)
- Bootstrap gain (sealed source)
- Linearity (signal injection)
- Document results in 'traveller' on confluence
- Next detector deployed: Kayla to lead meeting for mapping detectors to experiments.
|
30 min | Status | All | - Group priorities review:
- Detectors for Run 18
- Jungfrau commissioning plan and commissioning tests.
- ePix10k2M (new) Commissioning test plan, calibration along same lines as JF.
- ePix10k2M (old) Needs shroud re-replaced, plans for backplate replacement.
- ePix smalls tests to match.
- Detailed calibration on ePix/Jungfrau smalls
- Detectors under development
- RIXS-CCD, review draft Project Plan w/NEH 2.2
- RIXS-CCD Concept Design (R to set meeting to talk cooling options)
- Anton project at UCB/SSL (milestone/schedule revision received)
- SXR Downselect prep
- Lab 'commissioning'
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- Laser table re-cert
- BIO for racks in chase
- DP node purchase
- Sealed source purchase (M&S evaporating)
Actions:
Other news: KZ: Epix 100 now working in XPP...what is distance between kapton and sensor surface? CH: USB patch cord available?? - Mask measurements last week.
- Project management training.
- Charge injection scripts on 10k smalls for mask tests.
RA: Beam pipes for 2M? In work. - Loan stages to CXI....ensure return.
- Meet re cooling concepts...met with Jim re outside space: not much.
KP: JSA summary list circulated - Small Rayonix to be tested in XPP...manual available??
- XPP/MFX/XCS fibers due this week, other wise need ugly solution.
- Small Rayonix testing can be done by others.
- XPP/XCS power cable pinout (controls needs to tell us MPOD working)
PH: |
5 min | Budget Update | mmck | - M&S Status (Through July)
![](/download/attachments/289506727/image2020-8-10%208%3A36%3A10.png?version=1&modificationDate=1599147830000&api=v2)
- Labor snapshot (June actuals):
![](/download/attachments/289506727/image2020-8-10%208%3A44%3A45.png?version=1&modificationDate=1599147828000&api=v2)
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business | | |
Action items