You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Program

day 13

 particle

 energy

trigger

events

 purpose

mode

2.5

 S0+S2+S4+NOSh+NOS3+C1+C2

 100k

tagged photons scan CU position 3

 sync with AD, magnet at 600A

e

2.5

 S0+S2+S4+NOSh+NOS3+C1+C2

 100k

tagged photons scan CU position 4 (TBD)

 sync with AD, magnet at 600A

e

1

 S0+S2+S4+NOSh+NOS3+C1+C2

 100k

tagged photons scan CU position 4 (TBD)

 sync with AD, magnet at 240A

 

 

 

 

 

 move CU back to position 2, reconfigure the dump if necessary

e

0.5

 S0+S2+S4+NOSh+NOS3+C1+C2

 200K

tagged photons scan CU position 2

 

 

 

 

 

 

 move CU back to position 4, reconfigure dump if necessary

e

2.5

 S0+S2+NOSh+NOS3+C1+C2

 2M

full brem CU position 4 (TBD)

 no sync, magnet at 600A

  • No labels