The detector layer convention uses 1-7.
Module ID | Stereo (Half-Module ID) | Axial (Half-Module ID) | Assembled | Surveyed | Goodness (stereo/axial) | Mounted | Assignment | Notes |
---|---|---|---|---|---|---|---|---|
6 | 3 | 6 | ||||||
7 | 2 | 4 | ||||||
8 | 10 | 7 | Not terrible/Not great | |||||
9 | 8 | 9 | ||||||
4 | 1 | 5 |
Module ID | Stereo (Half-Module ID) | Axial (Half-Module ID) | 2014 Goodness (stereo/axial) | 2019 Goodness (stereo/axial) | 2021 Goodness (stereo/axial) | Assignment |
---|---|---|---|---|---|---|
0 | 24 | 9 | Bad channels in 2 APVs furthest from beam | Couldn't communicate with APV | ||
1 | 26 | 28 | Perfect | Perfect/Perfect | B4 | |
2 | 23 | 25 | Perfect | Perfect/Bad channels in second APV furthest from the beam | Few bad channels in middle/broken | Spare |
3 | 5 | 8 | Perfect | Bad channels in APV farthest from the beam /Perfect | T3 | |
4 | 16 | 1 | Perfect | Perfect/Couldn't communicate with an APV | ||
5 | 2 | 13 | Bad channels in APV furthest from beam | Several bad channels on APV farthest from the beam | Bad channels on edge/very bad | Spare |
6 | 22 | 29 | Perfect/Bad channel in APV furthest from beam | Perfect/Bad channel in APV furthest from the beam | T4 | |
7 | 14 | 21 | Bad channels in 2 APVs furthest from beam; Bad hinge fit, drilled out and sanded to fit | Bad channels in APV closest to the beam/Bad channels in second APV furthest from the beam | ||
8 | 7 | 3 | Bad channels in APV furthest from beam | Bad channels in APV furthest from the beam/ Bad channel in APV furthest from the beam | B3 | |
9 | 15 | 19 | Weird noise shape/Bad channel in APV furthest from beam (warm runs only) | Weird noise vs channel distribution. Response looks fine (from 2014 runs)./Bad channel in APV furthest from beam | Good (few bad in middle)/Good (few bad in middle) | Spare |
Module ID | Stereo (Half-Module ID) | Axial (Half-Module ID) | 2014 Goodness | Re-Tested | Goodness (stereo/axial) | Re-Mounted | Assignment |
---|---|---|---|---|---|---|---|
0 | 4 | 19 | bad channels in middle APVs | 5/11/19 (CB) | good/A hybrid flaky | ||
7 | 15 | 14 | bad channels in APV furthest from beam/perfect | 5/11/19 (CB) | good/good | yes | 7B |
8 | 1 | 13 | bad channels on both edges/bad channels in 2 APVs furthest from beam | 5/11/19 (CB) | good/B hybrid flaky sync | ||
3 | 9 | 4 | perfect | yes | 7T | ||
1 | 5 | 6 | perfect | untouched | 5B | ||
2 | 7 | 8 | perfect | 5/10/19 (CB) | untouched | 6B | |
4 | 2 | 3 | perfect | 5/10/19 (CB) | untouched | 5T | |
5 | 10 | 11 | perfect | 5/10/19 (CB) | untouched | 6T | |
broken sensor hole side (not broken) | N/A | N/A | N/A | 8/12/21 (AS) | looks OKAY | ||
broken sensor slot side (broken) | N/A | N/A | N/A | 8/12/21 (AS) | Some hybrid channels seem damaged | ||
Hybrid 100 | N/A | N/A | N/A | 8/12/21 (AS) | |||
Hybrid 101 | N/A | N/A | N/A | 8/12/21 (AS) |
Half-Module ID | Goodness (Hole) | Goodness (Slot) | Assignment | Notes |
---|---|---|---|---|
Alpha | Bad APV | Originally Module 0, axial | ||
Gamma | 0/5 APV sync. Pos clock noisy, No clock on CLK_N. Will replace clock fanout | 4/5 APV sync | Trying to recover hole side |
Module 3 was removed from 6B and the module 0 stereo half-module was mounted to module 3 axial by Tim in the hps alcove. Module 3 was not re-tested before going into 6T.
Find 4-6 half-module QA here: L4-L6 Half-Module Production