MFX Pre-beam Checkout |
---|
Area | Task | Date Completed | Comment |
---|
Vacuum |
|
|
|
| |
|
|
| |
|
|
| - Beamline fully under vacuum
|
|
|
Radiation Physics |
|
|
|
| |
|
|
| |
|
|
| - Test hutch search performed
|
|
|
| | |
|
| |
|
|
| - Administrative procedures for CRLs ready
|
|
|
| - Modifications to focusing optics approved
|
|
|
| |
|
|
Controls |
|
|
|
| |
|
|
| |
|
|
| | 7/9/23 - LBG | mec_yag0 might be moving. The numbers say it is moving. Tough to see but the camera shows some motion. |
| |
|
|
| |
|
|
| - Interlocks functional and tested
|
|
|
| |
|
|
| | 7/9/23 - LBG | it starts anyways. |
| - Cameras tested
- fee_spec
- mec_yag0
- xcs_yag2
- mfx_dia_yag
- mfx_dg1_yag
- mfx_dg2_yag
- mfx_dg3_yag
- Web Cameras
- webcam-mfx-north
- webcam-mfx-northeast
- webcam-mfx-southeast
- webcam-mfx-southwest
- webcam-mfx-east
| 7/9/23 - LBG
7/10/23 - SM | mfx_dia_yag starts but Data rate drops a lot over time. ~0.1 Hz.
mfx_dg3_yag not working. Possibly not plugged in.
Webcams connect & movement verified. |
| - Beam transport path clear and tested
|
|
|
| - X-ray Optics ready and motion tested
|
|
|
| - Switching between timing systems ready
|
|
|
| - Time tracking eloggrabber works
|
|
|
DAQ |
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| - Switching between timing systems ready
|
|
|
| |
|
|
PMPS |
|
|
|
| - Verify that there are no PMPS faults
|
|
|
Beamline Components |
|
|
|
XRT | - MR1L4
- Set mirror IN works
- Set mirror OUT works
- Set coating W works
- Set coating SiC works
- Move mirror pitch -500 to 500 µrad
|
|
|
DIA | - Pulse Picker
- Move to open position
- Move to closed position
- Flip-flop mode
| |
|
| - Attenuators
- All attenuators close/open
- MFX3 att(0) works correctly.
- MFX3 att(1E-99) works correctly.
- MFX3 att(1) works correctly.
- Verify 0 and 100% are determined correctly in MFX home
| |
|
| - Prefocusing Lens
- Lens 1 inserts and removes.
- Lens 2 inserts and removes.
- Lens 3 inserts and removes.
| |
|
| | |
|
DG1 | | |
|
| | |
|
| | |
|
TFS | |
|
|
DG2 | |
|
|
| |
|
|
| |
|
|
| | |
|
| - ATM (timetool)
- CamViewer Visualization
- Move to any "IN" target
- Producing an Image on CamViewer
- Check X motion
- Move to "OUT" target
|
|
|
TAB | | |
|
DG3 |
|
|
|
DET | - Detector Table
- Verify detector floor interlock works.
- Verify table moves.
|
|
|
| |
|
|
|
|
|
|